High Level Construction Co
- Based in
- San Francisco
- On San Francisco permits
- Dec 2003 to Jan 2026
- Last 24 months
- 2 permits filed
44 permits since 2000: 40 completed, 4 never finaled.
Of the 4 never-finaled permits, 3 are 5 to 10 years old, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Deck permits
2 deck permits: 2 completed. Typically 36 days from filing to permit and 90 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Dec 10, 2024 | Completed final sign-off Jul 2025 | 234 Madrid St | new 1-level deck @ rear yard. at 1st floor remodel (e) space to (n) family w/wet bar, (n) laundry, (n) bath and (n) bedroom. adding 807 sqft.Details
new 1-level deck @ rear yard. at 1st floor remodel (e) space to (n) family w/wet bar, (n) laundry, (n) bath and (n) bedroom. adding 807 sqft. | $182,000 |
| Apr 8, 2014 | Completed final sign-off May 2014 | 7227 Geary Bl | unit 1: deck repair (less than 50%)for unit #1; (common area)partial rear exterior wall repair under the deck siding only. no structural workDetails
unit 1: deck repair (less than 50%)for unit #1; (common area)partial rear exterior wall repair under the deck siding only. no structural work | $19,950 |