High Level Construction And Painting
- Based in
- Oakland
- On San Francisco permits
- Feb 2021 to Feb 2026
- Last 24 months
- 2 permits filed
4 permits since 2000: 2 in progress, 1 never finaled, 1 expired or cancelled.
Of the 1 never-finaled permit, 1 is 3 to 5 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Feb 11, 2026 | In progress issued Feb 2026 | 2182 48th Av | remodel kitchen and bathroom. exterior decking replacement (in-kind).Details
remodel kitchen and bathroom. exterior decking replacement (in-kind). | $40,000 |
| May 7, 2025 | Expired or cancelled expired Jun 2026 | 128 Vicksburg St | revision to pa #202102195046 - rear structure - change window type from aluminum to fiberglassDetails
revision to pa #202102195046 - rear structure - change window type from aluminum to fiberglass | $15,000 |
| May 11, 2023 | Never finaled issued Jun 2023, no final | 1426 Polk St | provide restaurant inside existing facility which was restaurant, adding a new restroom as shown a1.1, repair ceiling & floor, repair or change doorsDetails
provide restaurant inside existing facility which was restaurant, adding a new restroom as shown a1.1, repair ceiling & floor, repair or change doors | $65,000 |
| Feb 19, 2021 | In progress issued Oct 2024 | 128 Vicksburg St | convert existing detached garage (legal non-conforming structure) into an adu.Details
convert existing detached garage (legal non-conforming structure) into an adu. | $95,000 |