High City Construction Llc
- Based in
- San Jose
- On San Francisco permits
- Mar 2025 to Mar 2025
- Last 24 months
- 2 permits filed
2 permits since 2000: 2 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Mar 19, 2025 | Completed final sign-off May 2025 | 226 Rutledge St | in front, visible from street, 3 window replacement in kind in same opening. same size same location. approx. 300 sq ft of wood siding repair in kind. in rear, 3 window replacement in kind in same opening. replace front door in kind in same opening.Details
in front, visible from street, 3 window replacement in kind in same opening. same size same location. approx. 300 sq ft of wood siding repair in kind. in rear, 3 window replacement in kind in same opening. replace front door in kind in same opening. | $11,200 |
| Mar 17, 2025 | Completed final sign-off Jun 2025 | 226 Rutledge St | remove deck at back yard. remodel 3 bathroom and 1 kitchen in kind.Details
remove deck at back yard. remodel 3 bathroom and 1 kitchen in kind. | $60,000 |