Hi Level Inc
- Based in
- San Mateo
- On San Francisco permits
- Nov 2014 to May 2020
- Last 24 months
- 0 permits filed
15 permits since 2000: 12 completed, 3 never finaled.
Of the 3 never-finaled permits, 1 is 5 to 10 years old, 2 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Deck permits
2 deck permits: 2 completed. Typically 11 days from filing to permit and 225 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Apr 29, 2019 | Completed final sign-off Aug 2019 | 274 Topeka Av | build a new exterior redwood deck 5'x12' sister joist.Details
build a new exterior redwood deck 5'x12' sister joist. | $5,000 |
| Jun 17, 2015 | Completed final sign-off Jun 2016 | 3759 22nd St | remodel upper and main floor, remove stair from main floor to lower floor, replace redwood decking to ipe wood, add skylight, new furance & gas water heater, replace windows as in kind, add powder room, master bathroom, washer & dryer. legalize living, sitting area & bathroom, remove kitchen on g/f.Details
remodel upper and main floor, remove stair from main floor to lower floor, replace redwood decking to ipe wood, add skylight, new furance & gas water heater, replace windows as in kind, add powder room, master bathroom, washer & dryer. legalize living, sitting area & bathroom, remove kitchen on g/f. | $80,000 |