Henry J Rabbitt & Sons Inc
- Based in
- San Francisco
- On San Francisco permits
- Mar 2010 to Mar 2024
- Last 24 months
- 0 permits filed
21 permits since 2000: 16 completed, 1 in progress, 4 never finaled.
Of the 4 never-finaled permits, 4 are 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
5 bathroom remodel permits: 3 completed, 2 never finaled. Typically 0 days from filing to permit and 175 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 22, 2020 | Never finaled issued Jan 2021, no final | 575 Crestlake Dr | interior remodel consisting of relocation of laundry, enlargement of family room, interior stair relocation and addition of a full bathroom on 1/f. split level to include kitchen remodel. removal of half bath, and relocation of interior stair to 1/f, 2/f to include new full bathroom, master bathroomDetails
interior remodel consisting of relocation of laundry, enlargement of family room, interior stair relocation and addition of a full bathroom on 1/f. split level to include kitchen remodel. removal of half bath, and relocation of interior stair to 1/f, 2/f to include new full bathroom, master bathroom | $75,000 |
| Aug 20, 2019 | Completed final sign-off Nov 2019 | 3525 Lawton St | one bathroom remodel: work include re-tile bathroom, install new vanity and shower valve. install new kitchen counter-top at kitchen, existing cabinets and appliances stay same (no work). no lighting work, no new wall and no existing wall relocation.Details
one bathroom remodel: work include re-tile bathroom, install new vanity and shower valve. install new kitchen counter-top at kitchen, existing cabinets and appliances stay same (no work). no lighting work, no new wall and no existing wall relocation. | $5,000 |
| May 31, 2018 | Never finaled issued Jun 2018, no final | 894 22nd St | interior remodel all units in (e) 3-unit building including (e) kitchens and baths and add (1) new bath per unit. remove several walls to provide open kitchen/living/dining each unit. no exterior work.Details
interior remodel all units in (e) 3-unit building including (e) kitchens and baths and add (1) new bath per unit. remove several walls to provide open kitchen/living/dining each unit. no exterior work. | $140,000 |
| Jul 24, 2012 | Completed final sign-off Jan 2013 | 960 Anza St | unit # 4: remodel bathroom in kind. replace 2 windows in the rear in kind. provide high efficacy lighting and max. 4 u factor @ windowsDetails
unit # 4: remodel bathroom in kind. replace 2 windows in the rear in kind. provide high efficacy lighting and max. 4 u factor @ windows | $15,000 |
| Dec 19, 2011 | Completed final sign-off Jun 2020 | 894 35th Av | remodel kitchen in kind replace all windows in kind, wood to match existing remodel 2 1/2 baths in kind, no structural work, no windows visible from street; lighting to comply with cec 150(k); changed max u factor of window .40Details
remodel kitchen in kind replace all windows in kind, wood to match existing remodel 2 1/2 baths in kind, no structural work, no windows visible from street; lighting to comply with cec 150(k); changed max u factor of window .40 | $50,000 |