Back to bathroom remodel contractors
Henry Construction Company
- Based in
- San Francisco
- On San Francisco permits
- Oct 2006 to Dec 2010
- Last 24 months
- 0 permits filed
2 permits since 2000: 2 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
1 bathroom remodel permit: 1 completed. Typically 0 days from filing to permit and 57 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Dec 7, 2010 | Completed final sign-off Feb 2011 | 540 19th Av | master bathroom: bath tub change to shower, tile shower and wall, replace vanity, all fixture, paint, tile floor, toilet. 2/f bathroom: tile around over bathtub & floor, replace vanity, toilet, all fixtures, paint. no structural changes. (n) light is comply w/cec150(k)Details
master bathroom: bath tub change to shower, tile shower and wall, replace vanity, all fixture, paint, tile floor, toilet. 2/f bathroom: tile around over bathtub & floor, replace vanity, toilet, all fixtures, paint. no structural changes. (n) light is comply w/cec150(k) | $12,000 |