43 permits since 2000: 26 completed, 8 in progress, 2 never finaled, 7 expired or cancelled.
Of the 2 never-finaled permits, 2 are 3 to 5 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
15 bathroom remodel permits: 10 completed, 3 in progress, 1 never finaled, 1 expired or cancelled. Typically 29 days from filing to permit and 365 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 10, 2026 | In progress issued Sep 2026 | 3859 21st St | the interior remodel of level 2 of the existing home to relocate and remodel the existing primary bath and primary closet, new wall finish, new floor finish, new lighting and new outlets. a new heated towel bar will be installed.Details
the interior remodel of level 2 of the existing home to relocate and remodel the existing primary bath and primary closet, new wall finish, new floor finish, new lighting and new outlets. a new heated towel bar will be installed. | $50,000 |
| Feb 27, 2026 | In progress issued Feb 2026 | 88 Sotelo Av | demo (e) plaster as required to replace knob & tube wiring, galvanized piping and remodel two bathrooms in-kind.Details
demo (e) plaster as required to replace knob & tube wiring, galvanized piping and remodel two bathrooms in-kind. | $100,000 |
| Jun 12, 2025 | Completed final sign-off Apr 2026 | 488 Folsom St | interior remodel of an (e) condo including new kitchen cabinetry to replace the (e), new kitchen hood & sink to replace the (e), new shower and vanity to replace (e) primary bathroom, new electric fireplace. new diffusers, new led lighting and upgrade electrical panelDetails
interior remodel of an (e) condo including new kitchen cabinetry to replace the (e), new kitchen hood & sink to replace the (e), new shower and vanity to replace (e) primary bathroom, new electric fireplace. new diffusers, new led lighting and upgrade electrical panel | $200,000 |
| Apr 10, 2025 | Completed final sign-off Oct 2025 | 148 Faith St | in-kind bathroom remodel.Details
in-kind bathroom remodel. | $50,000 |
| Nov 26, 2024 | In progress issued Feb 2025 | 1335 Filbert St | unit#306. kitchen remodel, construct new bathroom, new floor.Details
unit#306. kitchen remodel, construct new bathroom, new floor. | $80,000 |
| Jun 25, 2024 | Completed final sign-off Dec 2025 | 1531 Funston Av | partial demo & alteration of (e) 1st & 2nd fl. remove (e) windows where indicated in plans. add (n) door & windows at rear elevation. infill (e) north lightwell. add (n) laundry (n) skylight, (n) half bath & (n) full bath. replace (e) siding. excavate below grade. new habitable spaceDetails
partial demo & alteration of (e) 1st & 2nd fl. remove (e) windows where indicated in plans. add (n) door & windows at rear elevation. infill (e) north lightwell. add (n) laundry (n) skylight, (n) half bath & (n) full bath. replace (e) siding. excavate below grade. new habitable space | $180,000 |
| Mar 28, 2024 | Completed final sign-off Feb 2026 | 40 Diamond St | remodel of an existing 3 bedroom, two bathroom sfr on 1/f existing non structural wall will be demolished and new walls will be added to create a den, wet bar, office, new bath and a relocated laundry. 2/f: non structural walls will be demolsihed and new walls will be added to reconfigure the primarDetails
remodel of an existing 3 bedroom, two bathroom sfr on 1/f existing non structural wall will be demolished and new walls will be added to create a den, wet bar, office, new bath and a relocated laundry. 2/f: non structural walls will be demolsihed and new walls will be added to reconfigure the primar | $400,000 |
| Oct 23, 2023 | Completed final sign-off Dec 2023 | 575 Ellsworth St | remodel 1 (e) bathroom in-kind. re-wire to code. replace dryrot at subfloor. replace vanity, sink, shower valve, toilet. install bath fan and bath fan ducting.Details
remodel 1 (e) bathroom in-kind. re-wire to code. replace dryrot at subfloor. replace vanity, sink, shower valve, toilet. install bath fan and bath fan ducting. | $35,000 |
| May 16, 2023 | Expired or cancelled expired Jan 2026 | 763 Ulloa St | remodel (e) 850 sf of ground floor space, relocate laundry & bathroom. no change in fixture count, alter windows, non visible from street. provide voluntary plywood sht'g & epoxy set anchor bolts to opened walls. convert rec room to bedroom, add study roomDetails
remodel (e) 850 sf of ground floor space, relocate laundry & bathroom. no change in fixture count, alter windows, non visible from street. provide voluntary plywood sht'g & epoxy set anchor bolts to opened walls. convert rec room to bedroom, add study room | $80,000 |
| Oct 6, 2022 | Completed final sign-off Dec 2023 | 3834 25th St | remodel kitchen, powder room, and full bath in kind. full bath has tubDetails
remodel kitchen, powder room, and full bath in kind. full bath has tub | $80,000 |
| Jun 7, 2022 | Never finaled issued Jun 2022, no final | 2900 Pierce St | unit #6: convert bathroom to new bedroom and construct new smaller bathroom.Details
unit #6: convert bathroom to new bedroom and construct new smaller bathroom. | $25,000 |
| Apr 6, 2022 | Completed final sign-off Jun 2023 | 338 Main St | unit 3g: replace kitchen island & counter tops. replace bath counter. add electric ventless fire place. add soffit for recessed lighting. no exterior changes. no structural.Details
unit 3g: replace kitchen island & counter tops. replace bath counter. add electric ventless fire place. add soffit for recessed lighting. no exterior changes. no structural. | $22,000 |
| Feb 8, 2022 | Completed final sign-off Jan 2023 | 818 Congo St | g/f storage remodel into laundry, 2/f laundry room into bedroom, remodel bathroom, change size of (1) window (backyard), 3/f remodel (e) bathroom & walk-in closet.Details
g/f storage remodel into laundry, 2/f laundry room into bedroom, remodel bathroom, change size of (1) window (backyard), 3/f remodel (e) bathroom & walk-in closet. | $95,000 |
| Jan 14, 2021 | Completed final sign-off Oct 2025 | 2241 Sacramento St | unit #2: renovation and reconfiguration of the (e) kitchen and pantry areas, remodel of (2) existing bathrooms, and expnded interior door openings at kitchen and studyDetails
unit #2: renovation and reconfiguration of the (e) kitchen and pantry areas, remodel of (2) existing bathrooms, and expnded interior door openings at kitchen and study | $75,000 |
| Sep 12, 2020 | Completed final sign-off May 2022 | 234 Gates St | convert basement storage to living space, infill below (e) rear room, (1) new full bath, relocate laundry, (2) new exterior doors & (2) new windows.Details
convert basement storage to living space, infill below (e) rear room, (1) new full bath, relocate laundry, (2) new exterior doors & (2) new windows. | $150,000 |