Back to bathroom remodel contractors
Hazel Construction Inc.
- Based in
- San Anselmo
- On San Francisco permits
- Feb 2000 to Jul 2013
- Last 24 months
- 0 permits filed
37 permits since 2000: 14 completed, 7 never finaled, 16 expired or cancelled.
Of the 7 never-finaled permits, 7 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
4 bathroom remodel permits: 2 completed, 2 never finaled. Typically 11 days from filing to permit and 116 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 23, 2013 | Never finaled issued Aug 2013, no final | 1040 Mariposa St | provide new fully accessible bldg entry and route to extg bathrooms. provide new mechanical ventilation system per mechanical drawings.Details
provide new fully accessible bldg entry and route to extg bathrooms. provide new mechanical ventilation system per mechanical drawings. | $52,750 |
| Sep 26, 2007 | Completed final sign-off Nov 2007 | 3900 Washington St | bath tub replacement, replace electrical switch & lights, paint, flooring, upgrade electrical outlets. no change to partitions or windows.Details
bath tub replacement, replace electrical switch & lights, paint, flooring, upgrade electrical outlets. no change to partitions or windows. | $12,000 |
| May 14, 2004 | Never finaled issued May 2004, no final | 58 Cityview Wy | address 200342643 nov replace in kind 4 windows,remodel bath/kitchen,new finishes onlyDetails
address 200342643 nov replace in kind 4 windows,remodel bath/kitchen,new finishes only | $20,000 |
| Jul 31, 2002 | Completed final sign-off Feb 2003 | 535 York St | bathroom remodel add 1 hvac unit elec plumbDetails
bathroom remodel add 1 hvac unit elec plumb | $68,000 |