Permit GraphShortlistSan Francisco building permits since 2000

Hawthorne Construction

Contractor license
1122642
State license record
Based in
San Francisco
On San Francisco permits
Dec 2025 to Aug 2026
Last 24 months
6 permits filed

6 permits since 2000: 3 completed, 3 in progress.

CompletedIn progressNever finaledExpired or cancelled

This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records

Permits filed each year

How long permits take

Median days to final inspection, citywideMedian days to permit issued, citywide

Each point is the quarter the permits were filed, for deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.

Where they worked

One dot per permit, coloured by the building type the city or the assessor gives it. A dark circle is several permits close together: click it to zoom in.

Deck permits

AllDeck 2Stairs 1Kitchen remodel 4Bathroom remodel 2

2 deck permits: 1 completed, 1 in progress. Typically 14 days from filing to permit and 7 days from permit to final inspection.

FiledOutcomeAddressWork described on the permitDeclared cost
Mar 23, 2026In progress
issued Apr 2026
170 Caselli Av170-172 caselli avenue: repair (e) dry-rot wooden deck like to like @ rear, less than 50%. #170: replace window w/ sliding door @ 2/f. #172: repair (e) cantilever balcony @ 3/f. remodel kitchen for open design. raise ceiling @ (e) hall to match 3/f (e) ceiling height.
Details
Permit
202603238104
Permit issued
Apr 20, 2026

170-172 caselli avenue: repair (e) dry-rot wooden deck like to like @ rear, less than 50%. #170: replace window w/ sliding door @ 2/f. #172: repair (e) cantilever balcony @ 3/f. remodel kitchen for open design. raise ceiling @ (e) hall to match 3/f (e) ceiling height.

Open the permit page

$80,000
Dec 19, 2025Completed
final sign-off Dec 2025
53 Prospect Avto comply with nov 202547027: replace 5 window hardware in kind, screw loose handrail brackets, replace 3 deck boards that have dryrot, replace damaged drywall. all work at rear or interior of bldg.
Details
Permit
202512192275
Permit issued
Dec 19, 2025
Final sign-off
Dec 26, 2025

to comply with nov 202547027: replace 5 window hardware in kind, screw loose handrail brackets, replace 3 deck boards that have dryrot, replace damaged drywall. all work at rear or interior of bldg.

Open the permit page

$700