Back to bathroom remodel contractors
Harty Development
- Based in
- San Francisco
- On San Francisco permits
- Sep 2017 to May 2025
- Last 24 months
- 1 permit filed
10 permits since 2000: 8 completed, 2 expired or cancelled.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
5 bathroom remodel permits: 5 completed. Typically 9 days from filing to permit and 127 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| May 15, 2025 | Completed final sign-off Sep 2025 | 2091 31st Av | 1st fl relocate bath, new wall at foyer, new living room, new office not for sleeping; 2nd floor new bedroom , new bath, and remodel kitchen and (e) bathroomDetails
1st fl relocate bath, new wall at foyer, new living room, new office not for sleeping; 2nd floor new bedroom , new bath, and remodel kitchen and (e) bathroom | $110,000 |
| Aug 27, 2024 | Completed final sign-off May 2025 | 957 Teresita Bl | first floor (n) 836 sqft of habitable space: two (n) bedrooms, one (n) bathroom and one (n) family room. second flr: remodel kitchen and one (n) bathroom.Details
first floor (n) 836 sqft of habitable space: two (n) bedrooms, one (n) bathroom and one (n) family room. second flr: remodel kitchen and one (n) bathroom. | $180,000 |
| Jun 18, 2024 | Completed final sign-off Mar 2025 | 536 Rockdale Dr | 1/f: infill at rear. (n) 1048 sq ft of habitable space. relocation of connection stairs between 1/f and 2/f. 2/f: relocation of connecting stairs between 1/f and 2/f. (n) bathroom.Details
1/f: infill at rear. (n) 1048 sq ft of habitable space. relocation of connection stairs between 1/f and 2/f. 2/f: relocation of connecting stairs between 1/f and 2/f. (n) bathroom. | $57,350 |
| Dec 21, 2023 | Completed final sign-off Mar 2024 | 500 Taraval St | non structural remodel at second and third floors to include (1) new bathroom. (1) new bedroom. relocation of kitchen.Details
non structural remodel at second and third floors to include (1) new bathroom. (1) new bedroom. relocation of kitchen. | $80,000 |
| Sep 7, 2022 | Completed final sign-off Jan 2023 | 2240 Judah St | unit 2240: remodel 2/f, new bathroom; remove fireplace, (e)non load bearing walls btwn living rm/kitchen, new 3rd bedroom; unit 2242: remodel 3/f, new bathroom, remove fireplace & non load bearing walls btwn living rm/kitchen, new 3rd bedroom, new recessed front entry door; remove facade entry gate;Details
unit 2240: remodel 2/f, new bathroom; remove fireplace, (e)non load bearing walls btwn living rm/kitchen, new 3rd bedroom; unit 2242: remodel 3/f, new bathroom, remove fireplace & non load bearing walls btwn living rm/kitchen, new 3rd bedroom, new recessed front entry door; remove facade entry gate; | $83,424 |