Back to bathroom remodel contractors
Hartwell Construction
- Based in
- San Anselmo
- On San Francisco permits
- Jul 2000 to Jan 2022
- Last 24 months
- 0 permits filed
13 permits since 2000: 6 completed, 3 never finaled, 4 expired or cancelled.
Of the 3 never-finaled permits, 3 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
6 bathroom remodel permits: 1 completed, 3 never finaled, 2 expired or cancelled. Typically 4 days from filing to permit and 293 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Apr 29, 2015 | Never finaled issued Apr 2015, no final | 1342 Francisco St | kitchen remodel, move washer/dryer unit and bathroom remodel.Details
kitchen remodel, move washer/dryer unit and bathroom remodel. | $150,000 |
| May 10, 2013 | Never finaled issued May 2013, no final | 50 Fernwood Dr | repair fire damage: root, stucco, bathroom stucco, side of visible from street reference permit application #2013-0326-3071, all repair will be in-kind.Details
repair fire damage: root, stucco, bathroom stucco, side of visible from street reference permit application #2013-0326-3071, all repair will be in-kind. | $50,000 |
| Mar 26, 2013 | Never finaled issued Mar 2013, no final | 50 Fernwood Dr | demo stucco on north side of building (fire repair). install scafolding for demo, demo fire damaged upstair bathroom (exploratory)Details
demo stucco on north side of building (fire repair). install scafolding for demo, demo fire damaged upstair bathroom (exploratory) | $14,000 |
| Feb 15, 2008 | Completed final sign-off Dec 2008 | 42 Retiro Wy | remodel kitchen and laundry room, remodel downstair 1/2 bath, remodel master bathroom, remove kitchen window and resize additional kitchen window.Details
remodel kitchen and laundry room, remodel downstair 1/2 bath, remodel master bathroom, remove kitchen window and resize additional kitchen window. | $180,000 |
| Sep 5, 2007 | Expired or cancelled expired Dec 2008 | 2100 Scott St | 3rd floor-remodel kitchen and relocate window in kitchen. construct new beam in garage. add fireplace in master bedroom and two other bedroom on the 3rd floor. remodel bathroomDetails
3rd floor-remodel kitchen and relocate window in kitchen. construct new beam in garage. add fireplace in master bedroom and two other bedroom on the 3rd floor. remodel bathroom | $60,000 |
| Jul 2, 2007 | Expired or cancelled expired Dec 2008 | 2100 Scott St | remodel master bedrooms to make a walk-in closet. remodel bedroom amd main bath. remodel 2nd bath. install 2 closets in 3rd bedroom. new flooring on 3rd floor. all work 3rd floor. no exterior work.Details
remodel master bedrooms to make a walk-in closet. remodel bedroom amd main bath. remodel 2nd bath. install 2 closets in 3rd bedroom. new flooring on 3rd floor. all work 3rd floor. no exterior work. | $135,000 |