Harry Jc Zhang Construction Inc
- Based in
- San Francisco
- On San Francisco permits
- Oct 2022 to Oct 2022
- Last 24 months
- 0 permits filed
2 permits since 2000: 1 completed, 1 never finaled.
Of the 1 never-finaled permit, 1 is 3 to 5 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Oct 11, 2022 | Completed final sign-off Feb 2023 | 172 Robinhood Dr | repair siding. relocate of garden hose outlet. upgrade 200amp u/g service with meter main bside the front left garage door. 200amp subpanel.Details
repair siding. relocate of garden hose outlet. upgrade 200amp u/g service with meter main bside the front left garage door. 200amp subpanel. | $6,000 |
| Oct 11, 2022 | Never finaled issued Oct 2022, no final | 719 Silliman St | remodel bathroomDetails
remodel bathroom | $5,000 |