Back to bathroom remodel contractors
Harold Construction Company
- Based in
- San Francisco
- On San Francisco permits
- Jan 2000 to May 2014
- Last 24 months
- 0 permits filed
22 permits since 2000: 21 completed, 1 expired or cancelled.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
8 bathroom remodel permits: 8 completed. Typically 0 days from filing to permit and 120 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| May 20, 2014 | Completed final sign-off Oct 2014 | 1507 35th Av | remodel g/f garage entry & add new bathroom @ connected stairway space, new plywood to existing studwall, no change to (e) existing upper level of (e) house.Details
remodel g/f garage entry & add new bathroom @ connected stairway space, new plywood to existing studwall, no change to (e) existing upper level of (e) house. | $15,000 |
| Jul 16, 2012 | Completed final sign-off Oct 2012 | 1149 Athens St | comply with complaint# 201207221. remodel e kitchen, bath, add 1 new bath at 2nd floor. legalize 2 bedrooms, 1 bath room, laundry rm and 1 new bath at gr floorDetails
comply with complaint# 201207221. remodel e kitchen, bath, add 1 new bath at 2nd floor. legalize 2 bedrooms, 1 bath room, laundry rm and 1 new bath at gr floor | $32,000 |
| Feb 7, 2011 | Completed final sign-off Jun 2011 | 134 Granada Av | 2 new bedrooms, 1 bathroom, storage room & laundry area to be constructed at ground floorDetails
2 new bedrooms, 1 bathroom, storage room & laundry area to be constructed at ground floor | $38,000 |
| Apr 5, 2010 | Completed final sign-off Aug 2010 | 428 38th Av | new bathroom, remodel office room downstairs, add single story rear deck. no other changes.Details
new bathroom, remodel office room downstairs, add single story rear deck. no other changes. | $30,000 |
| Mar 14, 2008 | Completed final sign-off May 2008 | 2827 37th Av | comply w/nov #200794051: legalize 1 bedroom, 1 full bath and 1 laudry room on the ground floor. plum & elec under separate permits.Details
comply w/nov #200794051: legalize 1 bedroom, 1 full bath and 1 laudry room on the ground floor. plum & elec under separate permits. | $25,000 |
| Aug 30, 2007 | Completed final sign-off Jan 2008 | 85 Tioga Av | two bedroom, one bathroom and laundry room to be added at groundfloorDetails
two bedroom, one bathroom and laundry room to be added at groundfloor | $32,000 |
| Aug 22, 2007 | Completed final sign-off Dec 2007 | 136 Farragut Av | two bedrooms, storage room, & two full bathrooms to be added @ ground floor.Details
two bedrooms, storage room, & two full bathrooms to be added @ ground floor. | $46,000 |
| Jun 28, 2006 | Completed final sign-off Dec 2006 | 1347 Irving St | remodel 3 bathrooms, 1 kitchen, dryrot in back of building and change all windows (24) lighting to comply with title 24 energy codes. window ufactor to be appox 0.67Details
remodel 3 bathrooms, 1 kitchen, dryrot in back of building and change all windows (24) lighting to comply with title 24 energy codes. window ufactor to be appox 0.67 | $80,000 |