Back to bathroom remodel contractors
Hargens Inc.
- Based in
- South San Francisco
- On San Francisco permits
- Feb 2000 to Aug 2026
- Last 24 months
- 6 permits filed
284 permits since 2000: 230 completed, 2 in progress, 25 never finaled, 27 expired or cancelled.
Of the 25 never-finaled permits, 1 is 3 to 5 years old, 3 are 5 to 10 years old, 21 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
61 bathroom remodel permits: 55 completed, 5 never finaled, 1 expired or cancelled. Typically 0 days from filing to permit and 166 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Oct 9, 2024 | Completed final sign-off Mar 2025 | 46 Russell St | toilet line broke, water damages to sheetrock and insulation. remove and replace damaged sheetrock and insulation for lower level bathroom, hallway, bedroom, and living room.Details
toilet line broke, water damages to sheetrock and insulation. remove and replace damaged sheetrock and insulation for lower level bathroom, hallway, bedroom, and living room. | $80,000 |
| Aug 16, 2024 | Completed final sign-off Aug 2025 | 724 Irving St | rev 202311201146- remove non permitted storage and stairs located above bathroom on first floor (non compliant 2nd fl). new slab. interior remodeling/demo throughout.Details
rev 202311201146- remove non permitted storage and stairs located above bathroom on first floor (non compliant 2nd fl). new slab. interior remodeling/demo throughout. | |
| Jul 14, 2023 | Completed final sign-off Feb 2024 | 30 Conrad St | remove and replace floor tile, wall tiles, and drywall for upper bathroom; drywall for living room ceiling with approx. area 100 sf due to water damage. no plumbing fixtures replacement in bathroom.Details
remove and replace floor tile, wall tiles, and drywall for upper bathroom; drywall for living room ceiling with approx. area 100 sf due to water damage. no plumbing fixtures replacement in bathroom. | $59,181 |
| May 4, 2023 | Completed final sign-off Jul 2023 | 640 Davis St | water damage repair- sheetrock ceiling shower tile replacement- no modification to structure. located in vanity room, laundry area, and bathroom.Details
water damage repair- sheetrock ceiling shower tile replacement- no modification to structure. located in vanity room, laundry area, and bathroom. | $25,000 |
| Mar 2, 2023 | Completed final sign-off Apr 2023 | 640 Davis St | bathroom shower pan and wall replacement. no modifications to the structure.Details
bathroom shower pan and wall replacement. no modifications to the structure. | $25,000 |
| Jan 9, 2023 | Completed final sign-off Oct 2023 | 51 Jasper Pl | water damage repairs. remove and replace sheetrock- hall, bathroom, 3 bedrooms, new trim, painting, replace wiring where damaged. electical & plmg to have seperate permit.Details
water damage repairs. remove and replace sheetrock- hall, bathroom, 3 bedrooms, new trim, painting, replace wiring where damaged. electical & plmg to have seperate permit. | $75,000 |
| Aug 19, 2021 | Completed final sign-off Oct 2022 | 53 Jasper Pl | water damage repair from burst water supply line upper unit bathroom. drywall installation, replace knob & tube wiring, replace flooring. resetting of (e) plumbing fixtures in bathroom. no structural repairs of alteration. comply w/ nov 202174769Details
water damage repair from burst water supply line upper unit bathroom. drywall installation, replace knob & tube wiring, replace flooring. resetting of (e) plumbing fixtures in bathroom. no structural repairs of alteration. comply w/ nov 202174769 | $75,000 |
| Feb 3, 2021 | Completed final sign-off Aug 2021 | 1032 Chestnut St | complete bathroom remodel, new fixtures, sheetrock, drywall, insulation, tub toilet, sink due to water damageDetails
complete bathroom remodel, new fixtures, sheetrock, drywall, insulation, tub toilet, sink due to water damage | $35,000 |
| Sep 20, 2019 | Completed final sign-off Nov 2019 | 403 Main St | unit 119: pipe angle stop in bathroom broke: approx 18 sq ft of sidewalk. 12" from floor in living room. removed to dry. replace sheetrock in kind - replace entire flooring througout apartment.Details
unit 119: pipe angle stop in bathroom broke: approx 18 sq ft of sidewalk. 12" from floor in living room. removed to dry. replace sheetrock in kind - replace entire flooring througout apartment. | $10,000 |
| Nov 26, 2018 | Completed final sign-off Mar 2019 | 2305 34th Av | water damage at upstairs bathroom. retile, drywall, densfield, shower, repair plumbingDetails
water damage at upstairs bathroom. retile, drywall, densfield, shower, repair plumbing | $21,313 |
| Aug 27, 2018 | Completed final sign-off Jan 2020 | 151 Skyview Wy | kitchen and bath remodel, like for likeDetails
kitchen and bath remodel, like for like | $20,000 |
| Jun 25, 2018 | Completed final sign-off May 2019 | 1851 43rd Av | fire damage job: bring downstairs ground floor bathroom up to codeDetails
fire damage job: bring downstairs ground floor bathroom up to code | $5,000 |
| Dec 14, 2017 | Never finaled issued Dec 2017, no final | 24 Alviso St | sewer line broke in half bath, remove and reset toilet, walls in laundry area/bathroom cut up, 2 feet from floor, insulation/sheetrock, survey electrical for any code upgrades. check on plumbing to make sure up to codeDetails
sewer line broke in half bath, remove and reset toilet, walls in laundry area/bathroom cut up, 2 feet from floor, insulation/sheetrock, survey electrical for any code upgrades. check on plumbing to make sure up to code | $6,000 |
| Dec 7, 2017 | Completed final sign-off Jan 2018 | 1749 Broadway | #1- water damage from unit upstairs to hall bathroom, change can lights due to water damaged, remove and reset vanity, sheetrock, insulation.Details
#1- water damage from unit upstairs to hall bathroom, change can lights due to water damaged, remove and reset vanity, sheetrock, insulation. | $8,891 |
| Nov 21, 2017 | Completed final sign-off May 2019 | 1851 43rd Av | (fire by cigarette). fire dept. water damage. no structural replacement. drywall, insulation, check plumbing and electrical. water damage to 3 bedrooms, two bathrooms, dining room, living room. kitchen wall-remove and reset kitchen base cabinets, remove & reset bathroom fixturesDetails
(fire by cigarette). fire dept. water damage. no structural replacement. drywall, insulation, check plumbing and electrical. water damage to 3 bedrooms, two bathrooms, dining room, living room. kitchen wall-remove and reset kitchen base cabinets, remove & reset bathroom fixtures | $80,000 |
| Aug 24, 2017 | Completed final sign-off Nov 2017 | 541 26th Av | water damage unit #s 4, 3, 2, 1; all in bathrooms areas. new diverter valves, insulation, sheetrock, tiles, remove and rest toilets and vanity. garage ceiling fixed.Details
water damage unit #s 4, 3, 2, 1; all in bathrooms areas. new diverter valves, insulation, sheetrock, tiles, remove and rest toilets and vanity. garage ceiling fixed. | $66,100 |
| May 15, 2017 | Completed final sign-off Jul 2017 | 1552 Jackson St | unit 2: angle stop in bathroom broke, insulation/sheetrock, remove/reset toilet/vanity; to comply with his nov#201776251 date 5/4/2017, electrical to be inspection/brought up to code.Details
unit 2: angle stop in bathroom broke, insulation/sheetrock, remove/reset toilet/vanity; to comply with his nov#201776251 date 5/4/2017, electrical to be inspection/brought up to code. | $19,130 |
| Apr 5, 2017 | Completed final sign-off May 2017 | 210 Roosevelt Wy | repair work limited to bathroom only in unit #210 caused by water damage by unit #212. remove and reset plumbing vanity and toilet, insulation and sheetrock at wall and ceiling. no new wall and no existing wall relocation. all new sheetrock shall be 5/8" type x gyp bd. no lighting work.Details
repair work limited to bathroom only in unit #210 caused by water damage by unit #212. remove and reset plumbing vanity and toilet, insulation and sheetrock at wall and ceiling. no new wall and no existing wall relocation. all new sheetrock shall be 5/8" type x gyp bd. no lighting work. | $48,000 |
| Sep 2, 2016 | Completed final sign-off Sep 2019 | 41 Ottawa Av | unit legalization ord 43-14. refer to appl #2016-0705-1596. replace kitchen cabinets, bath vanities and legalize ground floor bedroom, bath and kitchen. mep under separate permit.Details
unit legalization ord 43-14. refer to appl #2016-0705-1596. replace kitchen cabinets, bath vanities and legalize ground floor bedroom, bath and kitchen. mep under separate permit. | $15,000 |
| Mar 22, 2016 | Completed final sign-off Oct 2016 | 290 Dorantes Av | repair to bottom portion of gyp board & mud sill due to water damage. remodel bathroomDetails
repair to bottom portion of gyp board & mud sill due to water damage. remodel bathroom | $25,000 |
| Nov 24, 2015 | Completed final sign-off Jun 2016 | 1923 21st Av | water damage in upstairs bathroom to downstair bathroom, sheetrock repair, replace insulation. check electrical & plumbing.Details
water damage in upstairs bathroom to downstair bathroom, sheetrock repair, replace insulation. check electrical & plumbing. | $67,000 |
| Nov 19, 2015 | Completed final sign-off Aug 2017 | 565 Laurel St | insulation, drywall, plumbing, electrical, replace windows, water damage to house, 1st repair master bed & master bath, 2nd guest bedrooms & bath, 3rd kitchen, living room, dining room, 4th garage, 2 windows in front of house will be same size and woodDetails
insulation, drywall, plumbing, electrical, replace windows, water damage to house, 1st repair master bed & master bath, 2nd guest bedrooms & bath, 3rd kitchen, living room, dining room, 4th garage, 2 windows in front of house will be same size and wood | $75,000 |
| Oct 20, 2015 | Completed final sign-off Mar 2016 | 66 Cleary Ct | unit #402: water damage to kitchen anad 2 bathrooms. remove and replace drywall and cabinets. new tile, vanity in both bathDetails
unit #402: water damage to kitchen anad 2 bathrooms. remove and replace drywall and cabinets. new tile, vanity in both bath | $30,000 |
| Sep 9, 2015 | Completed final sign-off Feb 2016 | 30 Bridgeview Dr | repair water damage in kitchen floor, laundry room, game room, family room. legalize bath garage level.demo plmg at wet bar family room(counter to remain. rebuild conc. landing of interior extg stair to family room.Details
repair water damage in kitchen floor, laundry room, game room, family room. legalize bath garage level.demo plmg at wet bar family room(counter to remain. rebuild conc. landing of interior extg stair to family room. | $15,000 |
| May 21, 2015 | Completed final sign-off Feb 2016 | 30 Bridgeview Dr | (water damage) in kitchen - hall - bathroom - replacing sheetrock in-kind.Details
(water damage) in kitchen - hall - bathroom - replacing sheetrock in-kind. | $15,000 |
| Dec 30, 2014 | Completed final sign-off Jun 2015 | 1001 Pine St | unit #608: bathroom remodel, new drywall, tile, tub & sink vanity, remove & reset toilet, finishes only. no wall modification, no structural work.Details
unit #608: bathroom remodel, new drywall, tile, tub & sink vanity, remove & reset toilet, finishes only. no wall modification, no structural work. | $6,500 |
| Nov 20, 2014 | Completed final sign-off Feb 2015 | 445 Corbett Av | unit #5: bathroom remodel to include, insulation, drywall, electrical (replace fixtures & switches) plumbing- remove & replace sink, toilet 5'x10'Details
unit #5: bathroom remodel to include, insulation, drywall, electrical (replace fixtures & switches) plumbing- remove & replace sink, toilet 5'x10' | $10,000 |
| Nov 20, 2014 | Completed final sign-off Feb 2015 | 445 Corbett Av | unit #3: bathroom remodel to include, insulation drywall, electrical (replace fixtures & switches) plumbing/remove and replace sink and toilet, 5'x10' no removal of wallDetails
unit #3: bathroom remodel to include, insulation drywall, electrical (replace fixtures & switches) plumbing/remove and replace sink and toilet, 5'x10' no removal of wall | $10,000 |
| Dec 5, 2013 | Completed final sign-off Sep 2014 | 65 Saint Charles Av | nonstructural interior remodel, add one new bath, new laundry, replace windows. all new wiring and ducts. new windows to be d.g. vinyl except @ front elevation (e) window to be 8'x6' xox. reglazeDetails
nonstructural interior remodel, add one new bath, new laundry, replace windows. all new wiring and ducts. new windows to be d.g. vinyl except @ front elevation (e) window to be 8'x6' xox. reglaze | $85,000 |
| Oct 15, 2013 | Completed final sign-off Nov 2013 | 650 Elizabeth St | remove & replace drywall & insulation in bathroom and hallway ceiling due to water damage.Details
remove & replace drywall & insulation in bathroom and hallway ceiling due to water damage. | $11,108 |
| Sep 11, 2013 | Completed final sign-off Oct 2013 | 1001 Pine St | bathroom remodel-tile over concrete walls & floors. new vanity, angle stopsDetails
bathroom remodel-tile over concrete walls & floors. new vanity, angle stops | $2,243 |
| Jul 11, 2013 | Never finaled issued Jul 2013, no final | 171 Vienna St | revision to app#201212065575. add bathroom and relocate kitchen.add skylight max u factor .40Details
revision to app#201212065575. add bathroom and relocate kitchen.add skylight max u factor .40 | $5,000 |
| Jun 25, 2013 | Completed final sign-off Sep 2014 | 65 Saint Charles Av | fire damage repair in like kind, repair 8ft x10 ft roof framing, repair 12 ft x 10 ft 2nd floor framing, replace gyp bd walls & ceilings, replace kitchen & bathroom fixtures, repair elec & mech, plbg (separate permits). all interior work not visible from street.Details
fire damage repair in like kind, repair 8ft x10 ft roof framing, repair 12 ft x 10 ft 2nd floor framing, replace gyp bd walls & ceilings, replace kitchen & bathroom fixtures, repair elec & mech, plbg (separate permits). all interior work not visible from street. | $120,000 |
| May 28, 2013 | Completed final sign-off Feb 2014 | 1342 Shafter Av | fire damage repair in like kind, repair roof & 3rd floor framing, replace damaged gyp bd @ 2nd & 3rd floors, replace bathroom & kitchen fixtures, install insulation, repair mech & elec ical (separate permits), all interior work not visible from street.Details
fire damage repair in like kind, repair roof & 3rd floor framing, replace damaged gyp bd @ 2nd & 3rd floors, replace bathroom & kitchen fixtures, install insulation, repair mech & elec ical (separate permits), all interior work not visible from street. | $150,000 |
| Oct 24, 2012 | Never finaled issued Oct 2012, no final | 1850 43rd Av | bathroom remodel due to water damage; to include electrical, plumbing insulation, drywall and tile, repair in kindDetails
bathroom remodel due to water damage; to include electrical, plumbing insulation, drywall and tile, repair in kind | $9,169 |
| Jun 4, 2012 | Completed final sign-off Dec 2012 | 1363 Masonic Av | comply with correction notice 2/2/12. remove non permitted kitchen fixtures at 1st floor. install portion between 2nd and 3rd floor rear stairs.3 legalize 1st floor bathroom.Details
comply with correction notice 2/2/12. remove non permitted kitchen fixtures at 1st floor. install portion between 2nd and 3rd floor rear stairs.3 legalize 1st floor bathroom. | $65,000 |
| Feb 9, 2012 | Completed final sign-off Aug 2012 | 5029 Diamond Heights Bl | remodel all 3 bathrooms - no strutural alterations. remove and replace plumbing fixtures, sinks, faucets, shower valves, toilets, new tile, install new lighting and insulation where needed.Details
remodel all 3 bathrooms - no strutural alterations. remove and replace plumbing fixtures, sinks, faucets, shower valves, toilets, new tile, install new lighting and insulation where needed. | $30,000 |
| Sep 19, 2011 | Completed final sign-off Dec 2011 | 1907 22nd Av | revision to pa# 2011.07.06.9582. water damage repair. replace bathrm fxitures, 1st and 2nd fl. replace 2nd fl bathroom roofDetails
revision to pa# 2011.07.06.9582. water damage repair. replace bathrm fxitures, 1st and 2nd fl. replace 2nd fl bathroom roof | |
| Aug 5, 2011 | Never finaled issued Aug 2011, no final | 3956 Clay St | install 2 new bathroom fans and exhaust venting in (e) bathrooms. also installing a kitchen range hood vent. exhaust duct to terminate min. 3' feeet from on building openings.Details
install 2 new bathroom fans and exhaust venting in (e) bathrooms. also installing a kitchen range hood vent. exhaust duct to terminate min. 3' feeet from on building openings. | $1,000 |
| Jul 6, 2011 | Completed final sign-off Dec 2011 | 1907 22nd Av | water damage repairs on 2 bathrooms, repl flooring, fixtures and wall finishes in each; provide hihg efficiency lights on "manual on" occupancy sensor in bathroomDetails
water damage repairs on 2 bathrooms, repl flooring, fixtures and wall finishes in each; provide hihg efficiency lights on "manual on" occupancy sensor in bathroom | $21,700 |
| Feb 24, 2011 | Completed final sign-off Jul 2011 | 1462 39th Av | revision to pa# 2010.09.07.0356. remove 14ft length of non load bearing walls at 1st floor. remodel 1st floor bathroom.Details
revision to pa# 2010.09.07.0356. remove 14ft length of non load bearing walls at 1st floor. remodel 1st floor bathroom. | |
| Sep 7, 2010 | Completed final sign-off Jul 2011 | 1462 39th Av | revision to app# 201006235117 - water damage repair. remove unpermitted stove at 1st floor; replace damaged gyp.bd. 1st flr upgrade bathroom, remove wet bar, correct bedroom ceiling height- all work on 1st flr. elec & plumbing repair (separate permits.)Details
revision to app# 201006235117 - water damage repair. remove unpermitted stove at 1st floor; replace damaged gyp.bd. 1st flr upgrade bathroom, remove wet bar, correct bedroom ceiling height- all work on 1st flr. elec & plumbing repair (separate permits.) | $35,000 |
| May 10, 2010 | Completed final sign-off Nov 2010 | 2533 Noriega St | install signage in male and female bathrooms. replace 14'ength of concrete stem wall on front foundation. repair stucco to match existing on front wall approx. 2' x 12' at lower portion.Details
install signage in male and female bathrooms. replace 14'ength of concrete stem wall on front foundation. repair stucco to match existing on front wall approx. 2' x 12' at lower portion. | $10,000 |
| Jan 19, 2010 | Completed final sign-off Jul 2010 | 31 Silliman St | fire restoration including: (n) drywal throught house, flooring replacement, remove & replace kitchen cabinetry, replace fixtures @ 2-bathrooms. replace w/ in-kind 3-wall studs and floor joist. revise damaged wires and upgrade to code where needed.Details
fire restoration including: (n) drywal throught house, flooring replacement, remove & replace kitchen cabinetry, replace fixtures @ 2-bathrooms. replace w/ in-kind 3-wall studs and floor joist. revise damaged wires and upgrade to code where needed. | $223,587 |
| Dec 16, 2009 | Completed final sign-off Jan 2010 | 581 45th Av | restore to original, water damage including exchange damage drywall at storage room, garage level and closet next to bathroom at 1st level and bottom 2 ft. around staircase, insulation no structural.Details
restore to original, water damage including exchange damage drywall at storage room, garage level and closet next to bathroom at 1st level and bottom 2 ft. around staircase, insulation no structural. | $18,000 |
| Dec 10, 2009 | Completed final sign-off Feb 2010 | 407 Detroit St | to bring master bath and hallway back to original condition due to water damage. insulation, drywall, minor plbg, new vinyl floor , tile painting on 2nd floor. hallway is approx. 10' long, bathrm is approx 5' x 7'. minor elec and plbg work.Details
to bring master bath and hallway back to original condition due to water damage. insulation, drywall, minor plbg, new vinyl floor , tile painting on 2nd floor. hallway is approx. 10' long, bathrm is approx 5' x 7'. minor elec and plbg work. | $25,000 |
| Oct 7, 2009 | Completed final sign-off Apr 2011 | 2205 Sacramento St | unit 301 - repair water damage at bathroom incl ceiling & walls. remove & replace 5/8 sheet rock type x, insulation, plumbing fixtures (toilet, sink, shower control) minor electrical upgrade. new lighting.Details
unit 301 - repair water damage at bathroom incl ceiling & walls. remove & replace 5/8 sheet rock type x, insulation, plumbing fixtures (toilet, sink, shower control) minor electrical upgrade. new lighting. | $10,000 |
| Apr 14, 2009 | Completed final sign-off Nov 2009 | 2187 42nd Av | due to minor kchn fire:remove & replace kchn cabinetry,remove & replace smoked damaged ceilings on kchn & hall stairway. remove & replace w/same sheetrock on smoke damaged walls through house.replace flooring through out. replace kchn & bathroom plmg fixtures. minor electrical. no structural change.Details
due to minor kchn fire:remove & replace kchn cabinetry,remove & replace smoked damaged ceilings on kchn & hall stairway. remove & replace w/same sheetrock on smoke damaged walls through house.replace flooring through out. replace kchn & bathroom plmg fixtures. minor electrical. no structural change. | $172,731 |
| Mar 11, 2009 | Completed final sign-off Mar 2009 | 250 Page St | remove and replace with same hardwood flooring at living area removeand replace with same vinyl flooring at kitchen remove and repalce sheetrock at bathroom - unit #6Details
remove and replace with same hardwood flooring at living area removeand replace with same vinyl flooring at kitchen remove and repalce sheetrock at bathroom - unit #6 | $12,000 |
| Dec 17, 2008 | Completed final sign-off Jul 2009 | 1447 12th Av | fire damage to upstairs bathroom, minor framing, plumbing, electrical, insulation & drywall. replace only what is burnt with like kind.Details
fire damage to upstairs bathroom, minor framing, plumbing, electrical, insulation & drywall. replace only what is burnt with like kind. | $72,000 |
| Jun 3, 2008 | Completed final sign-off Apr 2009 | 25 Thornton Av | new sheerock on interior walls throughout building, voluntary seismic upgrade to ex. structure. interior remodeling to create new bathroom, (n) dark room and storage closet in a portion of ex. garage space. relocate ex. 1 rear window and convert another into a french door. widen ex. interior stair.Details
new sheerock on interior walls throughout building, voluntary seismic upgrade to ex. structure. interior remodeling to create new bathroom, (n) dark room and storage closet in a portion of ex. garage space. relocate ex. 1 rear window and convert another into a french door. widen ex. interior stair. | $65,000 |
| Apr 14, 2008 | Completed final sign-off Feb 2009 | 156 16th Av | construct new 3rd floor bathroom in (e) lightwell area.Details
construct new 3rd floor bathroom in (e) lightwell area. | $20,000 |
| Feb 15, 2008 | Completed final sign-off Aug 2008 | 156 16th Av | fire damage repair: minor framing, replace burnt framing with like kind. plumbing, electrical, drywall & insulation & remodel bathroom. partial, minor framing repairs to rear wall of bathrooms @ top floor. replacement of a few joists in roof @ rear office/bedroom.Details
fire damage repair: minor framing, replace burnt framing with like kind. plumbing, electrical, drywall & insulation & remodel bathroom. partial, minor framing repairs to rear wall of bathrooms @ top floor. replacement of a few joists in roof @ rear office/bedroom. | $25,000 |
| Sep 12, 2006 | Completed final sign-off Nov 2006 | 1452 Van Dyke Av | remove & replace cabinets in kitchen, remove & replace sink in bathroom due to minor smoke/fire damage.Details
remove & replace cabinets in kitchen, remove & replace sink in bathroom due to minor smoke/fire damage. | $5,000 |
| Feb 7, 2005 | Never finaled issued Feb 2005, no final | 801 Vienna St | new plumbing,insulation & drywall due to water leak in bath area & bedroom. approx 200 s.f.areaDetails
new plumbing,insulation & drywall due to water leak in bath area & bedroom. approx 200 s.f.area | $5,000 |
| Aug 23, 2004 | Completed final sign-off Jan 2005 | 200 Divisadero St | bathroom remodel due to water damage. no structural changes. electrical & plumbing upgrades. (n) fixDetails
bathroom remodel due to water damage. no structural changes. electrical & plumbing upgrades. (n) fix | $10,000 |
| Apr 7, 2004 | Completed final sign-off Dec 2004 | 287 10th Av | bathroom & kitchen remodel, sheetrock, insulation, plumbing & electrical. no structuralDetails
bathroom & kitchen remodel, sheetrock, insulation, plumbing & electrical. no structural | $35,000 |
| Apr 7, 2004 | Completed final sign-off Dec 2004 | 285 10th Av | bathroom & kitchen remodel, sheetrock, insulation, plumbing & electrical. no structuralDetails
bathroom & kitchen remodel, sheetrock, insulation, plumbing & electrical. no structural | $35,000 |
| Jul 8, 2003 | Completed final sign-off Dec 2003 | 15 Sheldon Tr | fire damage repair in hall bathroom, full remodel/drywall/ elec./plumb., no structural damaage/changDetails
fire damage repair in hall bathroom, full remodel/drywall/ elec./plumb., no structural damaage/chang | $10,000 |
| Dec 19, 2002 | Completed final sign-off May 2003 | 1919 09th Av | bathroom remodel on ground floorDetails
bathroom remodel on ground floor | $10,000 |
| Jun 20, 2002 | Expired or cancelled expired Oct 2002 | 990 Duncan St | replacement of bathroom ceiling drywall and insulation due to water damageDetails
replacement of bathroom ceiling drywall and insulation due to water damage | $2,000 |