Back to bathroom remodel contractors
Hanley Construction
- Based in
- San Francisco
- On San Francisco permits
- Jul 2012 to Oct 2012
- Last 24 months
- 0 permits filed
2 permits since 2000: 2 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
1 bathroom remodel permit: 1 completed. Typically 1 days from filing to permit and 206 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 16, 2012 | Completed final sign-off Feb 2013 | 1995 Funston Av | kitchen remodel - new cabinets, new tile, rebuild stairs, add plugs, new appliances, remove wall between kitchen & dining rm. replace 2-windows with larger windows, remodel bath- new tile, vanity, toilet, sink, tub. upgrade plumbing to copper, move waste pipes, replace window/door with french door.Details
kitchen remodel - new cabinets, new tile, rebuild stairs, add plugs, new appliances, remove wall between kitchen & dining rm. replace 2-windows with larger windows, remodel bath- new tile, vanity, toilet, sink, tub. upgrade plumbing to copper, move waste pipes, replace window/door with french door. | $80,000 |