Back to bathroom remodel contractors
Hamta Partners Inc
- Based in
- Redwood City
- On San Francisco permits
- Aug 2013 to Nov 2021
- Last 24 months
- 0 permits filed
6 permits since 2000: 6 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
3 bathroom remodel permits: 3 completed. Typically 0 days from filing to permit and 349 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Nov 1, 2021 | Completed final sign-off Oct 2022 | 2919 25th Av | construct 1 bedroom, 2 full bath, 1 media room & upgrade 1 (e) bedroom at ground floor. remodel (e) kitchen & bathroom. construct 1 new bathroom & replace (e) sheetrock w/ new at 2nd floor.Details
construct 1 bedroom, 2 full bath, 1 media room & upgrade 1 (e) bedroom at ground floor. remodel (e) kitchen & bathroom. construct 1 new bathroom & replace (e) sheetrock w/ new at 2nd floor. | $150,000 |
| Apr 4, 2014 | Completed final sign-off Mar 2015 | 1668 Page St | unit #1 - comply w/nov 201448554 - remodel 1st floor (e) interior unit to include kitchen & bathrooms upgrades, opening between kitchen & dining room, replacement of all sheetrock, electrical system, replacement of windows sages & exterior paint of the building.Details
unit #1 - comply w/nov 201448554 - remodel 1st floor (e) interior unit to include kitchen & bathrooms upgrades, opening between kitchen & dining room, replacement of all sheetrock, electrical system, replacement of windows sages & exterior paint of the building. | $100,000 |
| Feb 10, 2014 | Completed final sign-off Mar 2015 | 1668 Page St | kitchen remodel, bathrooms remodel existing plumbing, electrical, insulation, moving some walls. existing kitchen and bathroom remodel for unit #1 (1st floor)Details
kitchen remodel, bathrooms remodel existing plumbing, electrical, insulation, moving some walls. existing kitchen and bathroom remodel for unit #1 (1st floor) | $50,000 |