Hamptons Blueprint Inc Dba Hampton Const
- Based in
- Modesto
- On San Francisco permits
- Jul 2011 to Mar 2012
- Last 24 months
- 0 permits filed
2 permits since 2000: 1 completed, 1 never finaled.
Of the 1 never-finaled permit, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Deck permits
1 deck permit: 1 never finaled. Typically 0 days from filing to permit.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Mar 21, 2012 | Never finaled issued Mar 2012, no final | 450 Ortega St | kitchen remodel: work includes remove & replace cabinets, electrical, plumbing, flooring & paint drywall. no wall relocation. repair dry rotted rear deck less than 50% in-kind. a min. 50% of the total rated wattage of permanently installed lighting in kitchen shall be high efficacy - cec 150(k)8.Details
kitchen remodel: work includes remove & replace cabinets, electrical, plumbing, flooring & paint drywall. no wall relocation. repair dry rotted rear deck less than 50% in-kind. a min. 50% of the total rated wattage of permanently installed lighting in kitchen shall be high efficacy - cec 150(k)8. | $25,000 |