Back to bathroom remodel contractors
Hammer & Hammer Construction
- Based in
- San Jose
- On San Francisco permits
- Mar 2019 to Mar 2022
- Last 24 months
- 0 permits filed
3 permits since 2000: 1 completed, 2 never finaled.
Of the 2 never-finaled permits, 1 is 3 to 5 years old, 1 is 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
1 bathroom remodel permit: 1 never finaled. Typically 17 days from filing to permit.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Nov 16, 2021 | Never finaled issued Dec 2021, no final | 603 Ellsworth St | 2nd floor: modify (e) den to (n) full bathroom. 1st floor: modify (e) bedrooms (n) hallway from foyer to (e) bedrooms; (n) wet barDetails
2nd floor: modify (e) den to (n) full bathroom. 1st floor: modify (e) bedrooms (n) hallway from foyer to (e) bedrooms; (n) wet bar | $32,000 |