Back to bathroom remodel contractors
Hammer Building Inc
- Based in
- Montara
- On San Francisco permits
- Jul 2007 to Nov 2018
- Last 24 months
- 0 permits filed
21 permits since 2000: 18 completed, 2 never finaled, 1 expired or cancelled.
Of the 2 never-finaled permits, 1 is 5 to 10 years old, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
8 bathroom remodel permits: 7 completed, 1 never finaled. Typically 0 days from filing to permit and 69 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 6, 2017 | Completed final sign-off Jan 2018 | 1776 Sacramento St | unit #302: two complete bath remodels including replacing tub, toilet, sink, vanity, tile, etc. exhaust fans to remain. all new lights are ledDetails
unit #302: two complete bath remodels including replacing tub, toilet, sink, vanity, tile, etc. exhaust fans to remain. all new lights are led | $25,000 |
| Mar 21, 2017 | Never finaled issued Mar 2017, no final | 1483 Sutter St | unit #601: bath - remove & replace bath, shower, lighting, add exhaust vent, toilet, vanity. kitchen - remove and replace all cabinets, appliances, new lighting.Details
unit #601: bath - remove & replace bath, shower, lighting, add exhaust vent, toilet, vanity. kitchen - remove and replace all cabinets, appliances, new lighting. | $20,000 |
| Jan 5, 2016 | Completed final sign-off Mar 2016 | 2543 Diamond St | remodel bath - new toilet, shower, tile, plumbing & electrical.Details
remodel bath - new toilet, shower, tile, plumbing & electrical. | $10,000 |
| Aug 4, 2015 | Completed final sign-off Oct 2015 | 366 15th Av | bathroom remodel - remove and replace vanity sinks, shower, tub - plumbing, lighting, exhaust fan.Details
bathroom remodel - remove and replace vanity sinks, shower, tub - plumbing, lighting, exhaust fan. | $12,000 |
| Jan 4, 2013 | Completed final sign-off Mar 2013 | 2329 Wawona St | remove and replace existing tiel, plumbing, electrical, and cabinetry. master bath. no structural workDetails
remove and replace existing tiel, plumbing, electrical, and cabinetry. master bath. no structural work | $20,000 |
| Jun 28, 2012 | Completed final sign-off Jul 2012 | 65 Digby St | remodel bathroom, replace existing shower with new tile. low flow thermastaic valve and shower head, repalce shower base as same. whanstone fiberglass to comply with complaint #201241841, no structural work.Details
remodel bathroom, replace existing shower with new tile. low flow thermastaic valve and shower head, repalce shower base as same. whanstone fiberglass to comply with complaint #201241841, no structural work. | $3,000 |
| Aug 31, 2009 | Completed final sign-off Nov 2009 | 262 24th Av | bathroom remodel, change tub to shower, new toilet & sink, tile floors and walls in shower. no walls to be removed, new lighting & exhaust fan.Details
bathroom remodel, change tub to shower, new toilet & sink, tile floors and walls in shower. no walls to be removed, new lighting & exhaust fan. | $15,000 |
| Jul 23, 2007 | Completed final sign-off Oct 2007 | 65 Collingwood St | bathroom remodel, no structural work. lighting to be flourscent or non occupant sensorDetails
bathroom remodel, no structural work. lighting to be flourscent or non occupant sensor | $10,000 |