Back to bathroom remodel contractors
Halperin Construction Co
- Based in
- San Francisco
- On San Francisco permits
- Feb 2000 to Mar 2025
- Last 24 months
- 1 permit filed
121 permits since 2000: 71 completed, 2 in progress, 33 never finaled, 15 expired or cancelled.
Of the 33 never-finaled permits, 5 are 3 to 5 years old, 5 are 5 to 10 years old, 23 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
13 bathroom remodel permits: 10 completed, 3 never finaled. Typically 0 days from filing to permit and 194 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Mar 14, 2022 | Completed final sign-off Nov 2023 | 85 Liberty St | apt 3 aka 851 guerrero st: install new kitchen countertop and appliances. repair water damage @ unit 3 bathroom ceiling. correct plumbing and electrical issues. replace in kind missing molding at front wall.Details
apt 3 aka 851 guerrero st: install new kitchen countertop and appliances. repair water damage @ unit 3 bathroom ceiling. correct plumbing and electrical issues. replace in kind missing molding at front wall. | $16,500 |
| Feb 15, 2022 | Never finaled issued Feb 2022, no final | 851 Guerrero St | comply with nov at apt 4: complaint 202185774 kitchen and bathroom remodel. no plans.Details
comply with nov at apt 4: complaint 202185774 kitchen and bathroom remodel. no plans. | $6,000 |
| Aug 8, 2018 | Completed final sign-off Dec 2018 | 656 39th Av | repairs at first floor bathroom-install new shower pan and tiles at existing shower. no structural workDetails
repairs at first floor bathroom-install new shower pan and tiles at existing shower. no structural work | $13,000 |
| Dec 9, 2015 | Never finaled issued Dec 2015, no final | 1125 Broderick St | install replacement window at 2nd floor bathroom. not visible from street. use tempered insulated glass. repair waer damage at master bath ceiling. repair in-king. no structural work. app. 50 sq. ft, u-factor .32 max.Details
install replacement window at 2nd floor bathroom. not visible from street. use tempered insulated glass. repair waer damage at master bath ceiling. repair in-king. no structural work. app. 50 sq. ft, u-factor .32 max. | $2,100 |
| Jul 14, 2014 | Completed final sign-off Oct 2014 | 455 Hazelwood Av | at existing master bath replace existing stall shower with new materials - demo tile, install new shower pan, new shower valve and new tiles. repair leak damage in kind if needed - new structural work.Details
at existing master bath replace existing stall shower with new materials - demo tile, install new shower pan, new shower valve and new tiles. repair leak damage in kind if needed - new structural work. | $6,700 |
| Feb 20, 2014 | Completed final sign-off Jan 2015 | 4052 23rd St | bath remodel at upper floor bathroom install new toilet, sink, shower at existing locations. install new tile at showerDetails
bath remodel at upper floor bathroom install new toilet, sink, shower at existing locations. install new tile at shower | $10,000 |
| Aug 19, 2011 | Completed final sign-off Apr 2012 | 1271 Stanyan St | revision to: permit#201107019356, rotted siding @ side & rear wall replace in-kind. install(n) shower pan & patch tiles in master bath. replace 2-windows @ front wall with identical looking winyl insulated windows, no chant in apperance, all work in kind.Details
revision to: permit#201107019356, rotted siding @ side & rear wall replace in-kind. install(n) shower pan & patch tiles in master bath. replace 2-windows @ front wall with identical looking winyl insulated windows, no chant in apperance, all work in kind. | $9,600 |
| Sep 8, 2010 | Completed final sign-off Feb 2011 | 42 Jordan Av | bath renovation, add (2) new skylights at bath.Details
bath renovation, add (2) new skylights at bath. | $35,000 |
| Oct 7, 2008 | Completed final sign-off Jun 2009 | 650 39th Av | permit revision to app #200809101173 to add skylight to second floor bathroom.Details
permit revision to app #200809101173 to add skylight to second floor bathroom. | $750 |
| Sep 10, 2008 | Completed final sign-off Jun 2009 | 650 39th Av | 2n floor bathroom remodel: install new sink, toilet & shower at (e) locations. patch surfaces after plumbings & electrical work. no structural work. replace 2 sq. of sidewalk where cracked.Details
2n floor bathroom remodel: install new sink, toilet & shower at (e) locations. patch surfaces after plumbings & electrical work. no structural work. replace 2 sq. of sidewalk where cracked. | $8,500 |
| Oct 23, 2006 | Completed final sign-off Feb 2007 | 630 39th Av | remodel (e) master bath and 1/2 bath. install now plumbing fixtures at same locations. install new isulation, sheetrock + tile as needed, patch holes from plumbing + electrical work. no structural work.Details
remodel (e) master bath and 1/2 bath. install now plumbing fixtures at same locations. install new isulation, sheetrock + tile as needed, patch holes from plumbing + electrical work. no structural work. | $23,600 |
| Jun 25, 2004 | Never finaled issued Jun 2004, no final | 444 Belvedere St | install new kitchen cabinet,counter tops @(e)locations,install new tub,toilet @master bathroom,patchDetails
install new kitchen cabinet,counter tops @(e)locations,install new tub,toilet @master bathroom,patch | $18,250 |
| Jun 25, 2003 | Completed final sign-off Sep 2003 | 3545 Washington St | at existing master bathroom -install new showerpans &tiles at exist location. patch surfacesDetails
at existing master bathroom -install new showerpans &tiles at exist location. patch surfaces | $4,900 |