Back to bathroom remodel contractors
Hal Pierce Electric Co
- Based in
- Vallejo
- On San Francisco permits
- Jun 2006 to Jul 2006
- Last 24 months
- 0 permits filed
2 permits since 2000: 2 never finaled.
Of the 2 never-finaled permits, 2 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
1 bathroom remodel permit: 1 never finaled. Typically 0 days from filing to permit.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 5, 2006 | Never finaled issued Jun 2006, no final | 268 Dore St | minor revisions / clarifications to pa# 2005/04/12/9789 s1 r11. currently under construction including: re-location of 2nd floor studios # 19, 21, 22, 24; lower ceiling height in front of building (bathrooms, entry lobby & studios # 12 & # 17) ; provide alternate construction detail for (1 hour /Details
minor revisions / clarifications to pa# 2005/04/12/9789 s1 r11. currently under construction including: re-location of 2nd floor studios # 19, 21, 22, 24; lower ceiling height in front of building (bathrooms, entry lobby & studios # 12 & # 17) ; provide alternate construction detail for (1 hour / |