Back to bathroom remodel contractors
Hai Sheng Hu Constructioin
- Based in
- Fremont
- On San Francisco permits
- Jan 2012 to Nov 2012
- Last 24 months
- 0 permits filed
3 permits since 2000: 3 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
1 bathroom remodel permit: 1 completed. Typically 11 days from filing to permit and 99 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Nov 16, 2012 | Completed final sign-off Mar 2013 | 279 Lobos St | revision to 201209079211. revise bathroom, closet, and hall location as shown in data 1. revise one 1st floor bedroom to a study.Details
revision to 201209079211. revise bathroom, closet, and hall location as shown in data 1. revise one 1st floor bedroom to a study. |