Back to bathroom remodel contractors
Hadley General Contractors Inc
- Based in
- Belvedere
- On San Francisco permits
- Jun 2000 to Sep 2023
- Last 24 months
- 0 permits filed
72 permits since 2000: 53 completed, 6 never finaled, 13 expired or cancelled.
Of the 6 never-finaled permits, 2 are 5 to 10 years old, 4 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
14 bathroom remodel permits: 10 completed, 4 expired or cancelled. Typically 0 days from filing to permit and 362 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Oct 1, 2021 | Expired or cancelled cancelled Jan 2026 | 1217 York St | replace french door with slide, awning window 3/f rear.rebuild (e) interior stair,remodel/reconfigure 2/f laundry & bathroom, 1/f powder room. windows under sep permit 202110019631.Details
replace french door with slide, awning window 3/f rear.rebuild (e) interior stair,remodel/reconfigure 2/f laundry & bathroom, 1/f powder room. windows under sep permit 202110019631. | $30,000 |
| May 9, 2018 | Completed final sign-off Jun 2021 | 25 Rico Wy | remodel kitchen, baths, replace existing gas fireplace, replalce finish floor material on levelsDetails
remodel kitchen, baths, replace existing gas fireplace, replalce finish floor material on levels | $1,200,000 |
| Jan 20, 2016 | Completed final sign-off Dec 2018 | 169 Upper Tr | interior remodel, lower portion of 1st fl to be level with rear grade. add elevator, remove all openings on west facade. replace all windows. 1/f to include sitting rm, bedroom & full bath; 2/f to include kitchen remodel; 3/f to include full & half bath remodel.Details
interior remodel, lower portion of 1st fl to be level with rear grade. add elevator, remove all openings on west facade. replace all windows. 1/f to include sitting rm, bedroom & full bath; 2/f to include kitchen remodel; 3/f to include full & half bath remodel. | $440,000 |
| Oct 22, 2014 | Expired or cancelled expired Mar 2018 | 3627 21st St | revision to 2014-06-03-7341. reconfigure of rooms on 1st & 2nd floors. add 1 bathroom. level 1st fl concrete slab. remove bay window on back side of house. route to cyril yu for plan check per bldg inspector joseph yu.Details
revision to 2014-06-03-7341. reconfigure of rooms on 1st & 2nd floors. add 1 bathroom. level 1st fl concrete slab. remove bay window on back side of house. route to cyril yu for plan check per bldg inspector joseph yu. | $50,000 |
| Mar 3, 2011 | Completed final sign-off May 2011 | 2371 Pacific Av | two bathrooms repair: replace tub, toilet, vanity, tile & drywall. plumbing permit on file, no wall relocation.Details
two bathrooms repair: replace tub, toilet, vanity, tile & drywall. plumbing permit on file, no wall relocation. | $14,800 |
| Feb 14, 2011 | Completed final sign-off Apr 2012 | 245 Chattanooga St | remodel of kitchen and office, associated plmg and kichen & bathrooms associated elctrical work. relocate windows at main floor rear elevation,demo wall and bathrroom at ground floor, demo inerior stair from main floor to second floor,fill in stair well openings.Details
remodel of kitchen and office, associated plmg and kichen & bathrooms associated elctrical work. relocate windows at main floor rear elevation,demo wall and bathrroom at ground floor, demo inerior stair from main floor to second floor,fill in stair well openings. | $80,000 |
| Jul 12, 2010 | Completed final sign-off Nov 2010 | 2043 Vallejo St | top/ 3rd floor unit. remove and replace 2nd bath vanity, sink , shower, toilet, counter top and tile, door and hardware. elec by others. no wall removal. high efficiency lighting or occupancy sensor control.Details
top/ 3rd floor unit. remove and replace 2nd bath vanity, sink , shower, toilet, counter top and tile, door and hardware. elec by others. no wall removal. high efficiency lighting or occupancy sensor control. | $47,500 |
| Apr 19, 2010 | Completed final sign-off Mar 2011 | 1070 Green St | remove and replace kit. cabs, appliances, countertop; non-struct opening (52") dining to kitchen; replace shower doors; new floor coverings and paint. kitchen atleast 50% high efficacy lighting. bathroom:high efficacy or occuancy sensor control. no change to exhaust system.Details
remove and replace kit. cabs, appliances, countertop; non-struct opening (52") dining to kitchen; replace shower doors; new floor coverings and paint. kitchen atleast 50% high efficacy lighting. bathroom:high efficacy or occuancy sensor control. no change to exhaust system. | $42,500 |
| Aug 7, 2009 | Completed final sign-off Apr 2010 | 3388 Clay St | rev.to pa# 2009.07.06.2013. remodel 3rd and 4th floors. bedrooms and bathrooms. minor exterior alterations including new dormer window, new skylights, enlarged baywindow at rear, partial lightwell infill. no alterations to front facade.Details
rev.to pa# 2009.07.06.2013. remodel 3rd and 4th floors. bedrooms and bathrooms. minor exterior alterations including new dormer window, new skylights, enlarged baywindow at rear, partial lightwell infill. no alterations to front facade. | $650,000 |
| Jul 6, 2009 | Completed final sign-off Apr 2010 | 3388 Clay St | remodel of 3rd and 4th floor bedrooms, bathrooms. reconfiguration. no additonal square footage. no exterior changes.Details
remodel of 3rd and 4th floor bedrooms, bathrooms. reconfiguration. no additonal square footage. no exterior changes. | $150,000 |
| Oct 30, 2008 | Expired or cancelled expired Apr 2010 | 2455 Leavenworth St | interior remodel of 1st & 2nd floors. 1st floor-consist of new powder bathroom, new storage under stairs and new broom closet. 2nd floor-consist of new bathroom, laundry closet, new closets & cabinets, relocation of (e) bathroomDetails
interior remodel of 1st & 2nd floors. 1st floor-consist of new powder bathroom, new storage under stairs and new broom closet. 2nd floor-consist of new bathroom, laundry closet, new closets & cabinets, relocation of (e) bathroom | $125,000 |
| Jul 28, 2006 | Completed final sign-off Jan 2008 | 1070 Green St | interior remodel per attached plans, (2) bathrooms, kitchen, dining, & 2 bedroom, replace windows & sliding doors (3)Details
interior remodel per attached plans, (2) bathrooms, kitchen, dining, & 2 bedroom, replace windows & sliding doors (3) | $202,000 |
| Jan 27, 2004 | Expired or cancelled expired Aug 2005 | 1055 California St | #9- remodel master bath,remove (e)tub,enlarge (e)shower,replace vanity/tile floor coveringsDetails
#9- remodel master bath,remove (e)tub,enlarge (e)shower,replace vanity/tile floor coverings | $60,000 |
| Jul 17, 2000 | Completed final sign-off Aug 2001 | 440 El Camino Del Mar | remodel master bath,relocate tub toilet,vanity,rebuild shower-stall,relocate 3 non-bearing wallsDetails
remodel master bath,relocate tub toilet,vanity,rebuild shower-stall,relocate 3 non-bearing walls | $100,000 |