Back to bathroom remodel contractors
H W X Construction
- Based in
- San Francisco
- On San Francisco permits
- Sep 2017 to Feb 2022
- Last 24 months
- 0 permits filed
13 permits since 2000: 9 completed, 3 never finaled, 1 expired or cancelled.
Of the 3 never-finaled permits, 3 are 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
11 bathroom remodel permits: 8 completed, 2 never finaled, 1 expired or cancelled. Typically 3 days from filing to permit and 298 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Feb 28, 2022 | Completed final sign-off Apr 2022 | 266 South Hill Bl | remodel existing one bathroom on 2nd storyDetails
remodel existing one bathroom on 2nd story | $8,000 |
| Oct 8, 2021 | Expired or cancelled cancelled Apr 2026 | 180 Caine Av | remodel existing one kitchen and one bathroom on 2/fDetails
remodel existing one kitchen and one bathroom on 2/f | $30,000 |
| May 28, 2021 | Completed final sign-off Jun 2023 | 285 Valdez Av | kitchen and bathroom remodel on 2nd flr. remove low bearing wall.Details
kitchen and bathroom remodel on 2nd flr. remove low bearing wall. | $70,000 |
| Jun 26, 2020 | Completed final sign-off Dec 2020 | 1554 17th Av | kitchen remodel, bath remodel at 2nd floor. bath remodel at 3rd floor.Details
kitchen remodel, bath remodel at 2nd floor. bath remodel at 3rd floor. | $60,000 |
| Dec 20, 2018 | Completed final sign-off Jun 2020 | 1335 05th Av | unit 1335; remodel kitchen & dining, unit 1337; remodel kitchen dining & bathroom, re-built (e) interior staircase for both units, replace 10 windows facing street with aluminum wood clad with casement and picture windows.Details
unit 1335; remodel kitchen & dining, unit 1337; remodel kitchen dining & bathroom, re-built (e) interior staircase for both units, replace 10 windows facing street with aluminum wood clad with casement and picture windows. | $54,000 |
| May 29, 2018 | Never finaled issued Jun 2018, no final | 14 Woodhaven Ct | legalize family room. one full bath and one bedroom at 1st floor per planDetails
legalize family room. one full bath and one bedroom at 1st floor per plan | $25,000 |
| Mar 23, 2018 | Completed final sign-off Feb 2020 | 1539 17th Av | 1st fl - convert garage/storage space into habitable spce: 2 bedrooms, den, 2 baths; kitchen & bath remodel at 2nd fl; add 1 new bath & 1 new bedroom at 2nd fl; new deck & exterior stairs at rear yard.Details
1st fl - convert garage/storage space into habitable spce: 2 bedrooms, den, 2 baths; kitchen & bath remodel at 2nd fl; add 1 new bath & 1 new bedroom at 2nd fl; new deck & exterior stairs at rear yard. | $95,000 |
| Dec 21, 2017 | Completed final sign-off May 2018 | 2349 15th Av | remodel family room, two bathrooms, bedroom. add two bedrooms, study, two bathrooms & relocate washer & dryer at 1st floor per plan.Details
remodel family room, two bathrooms, bedroom. add two bedrooms, study, two bathrooms & relocate washer & dryer at 1st floor per plan. | $67,500 |
| Nov 27, 2017 | Completed final sign-off Mar 2019 | 2138 31st Av | replace int stairs. at 1st flr: convert (e) storage space to 1 bedrm, 2 baths, 1 office, 1 fmaily rm. at 2nd flr: remodel (e) kitchen & bath, add 1 new bath. partial infill of 2nd flr light court at north p.l., infill lightwell at south p.l. new deck & ext stairs @ north p.l.Details
replace int stairs. at 1st flr: convert (e) storage space to 1 bedrm, 2 baths, 1 office, 1 fmaily rm. at 2nd flr: remodel (e) kitchen & bath, add 1 new bath. partial infill of 2nd flr light court at north p.l., infill lightwell at south p.l. new deck & ext stairs @ north p.l. | $100,000 |
| Oct 5, 2017 | Never finaled issued Oct 2017, no final | 2349 15th Av | remodel kitchen and (2) bathrooms at 2nd floor. replace vanity, toilet, shower and cabinets. no change in walls and opening layout.Details
remodel kitchen and (2) bathrooms at 2nd floor. replace vanity, toilet, shower and cabinets. no change in walls and opening layout. | $33,000 |
| Sep 8, 2017 | Completed final sign-off Dec 2017 | 371 Orizaba Av | legalize and remodel rooms on ground floor. new media room with mechanical ventilation. two bedrooms and two baths. all work w/i existing building envelopeDetails
legalize and remodel rooms on ground floor. new media room with mechanical ventilation. two bedrooms and two baths. all work w/i existing building envelope | $50,000 |