Permit GraphShortlistSan Francisco building permits since 2000

H S Construction And Associates Co

Contractor license
933070
State license record
Based in
San Leandro
On San Francisco permits
Aug 2011 to Mar 2019
Last 24 months
0 permits filed

16 permits since 2000: 16 completed.

CompletedIn progressNever finaledExpired or cancelled

This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records

Permits filed each year

How long permits take

Median days to final inspection, citywideMedian days to permit issued, citywideThis contractor’s finished permits

Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.

Bathroom remodel permits

AllRoof deck 1Kitchen remodel 10Bathroom remodel 7

7 bathroom remodel permits: 7 completed. Typically 0 days from filing to permit and 100 days from permit to final inspection.

FiledOutcomeAddressWork described on the permitDeclared cost
Mar 18, 2019Completed
final sign-off May 2019
667 04th Avnew wiring whole house, new subpanel, new bathroom tiles, new vanity sink and cabinet kitchen new floor tiles, new painting on whole house
Details
Permit
201903185548
Status
complete
Filed
Mar 18, 2019
Permit issued
Mar 18, 2019
Final sign-off
May 7, 2019
Declared cost
$18,000
Address
667 04th Av

new wiring whole house, new subpanel, new bathroom tiles, new vanity sink and cabinet kitchen new floor tiles, new painting on whole house

Open the permit page

$18,000
Dec 11, 2018Completed
final sign-off Feb 2019
1538 48th Avapt 4: kitchen: replace cabinets and countertop. new tile floor, new paiting. bathroom: replace wall tile and floor tile, new painting.
Details
Permit
201812118039
Status
complete
Filed
Dec 11, 2018
Permit issued
Dec 12, 2018
Final sign-off
Feb 8, 2019
Declared cost
$8,000
Address
1538 48th Av

apt 4: kitchen: replace cabinets and countertop. new tile floor, new paiting. bathroom: replace wall tile and floor tile, new painting.

Open the permit page

$8,000
Nov 13, 2018Completed
final sign-off Feb 2019
2355 21st Avremodle kitchen and bathroom. new electrical, all plumbing fixture stay as existing same location. replace kitchen cabinet, sink, hood and washer/dryer. replace bathroom tub, sink and toilet.
Details
Permit
201811135718
Status
complete
Filed
Nov 13, 2018
Permit issued
Nov 13, 2018
Final sign-off
Feb 21, 2019
Declared cost
$20,000
Address
2355 21st Av

remodle kitchen and bathroom. new electrical, all plumbing fixture stay as existing same location. replace kitchen cabinet, sink, hood and washer/dryer. replace bathroom tub, sink and toilet.

Open the permit page

$20,000
Oct 22, 2018Completed
final sign-off Feb 2019
97 Valley Stremodel kitchen & bathroom on 2/f. new kitchen cabinets in same location as (e). bathroom: tub, toilet, sink, same location as (e) new tile floor at kitchen & bathroom. new painting. everything in same location.
Details
Permit
201810223813
Status
complete
Filed
Oct 22, 2018
Permit issued
Oct 22, 2018
Final sign-off
Feb 28, 2019
Declared cost
$8,000
Address
97 Valley St

remodel kitchen & bathroom on 2/f. new kitchen cabinets in same location as (e). bathroom: tub, toilet, sink, same location as (e) new tile floor at kitchen & bathroom. new painting. everything in same location.

Open the permit page

$8,000
Jul 31, 2017Completed
final sign-off Dec 2017
2131 30th Avsingle house remodeling kitchen & bathroom no changes to walls or addition of walls.
Details
Permit
201707313399
Status
complete
Filed
Jul 31, 2017
Permit issued
Jul 31, 2017
Final sign-off
Dec 8, 2017
Declared cost
$15,000
Address
2131 30th Av

single house remodeling kitchen & bathroom no changes to walls or addition of walls.

Open the permit page

$15,000
Nov 25, 2015Completed
final sign-off Feb 2017
345 Frederick St345 unit 2, 2nd fl rear unit: kitchen remodel, new access hallway 347 1st fl: open interior wall, basement add new bath. e bath remodel, legalize wet bar, replace rear door and window. work to all floors of this building. no conversion of unoccupied spaces under this permit. no change on attic.
Details
Permit
201511253642
Status
complete
Filed
Nov 25, 2015
Permit issued
Apr 18, 2016
Final sign-off
Feb 16, 2017
Declared cost
$150,000
Address
345 Frederick St

345 unit 2, 2nd fl rear unit: kitchen remodel, new access hallway 347 1st fl: open interior wall, basement add new bath. e bath remodel, legalize wet bar, replace rear door and window. work to all floors of this building. no conversion of unoccupied spaces under this permit. no change on attic.

Open the permit page

$150,000
Aug 24, 2012Completed
final sign-off Nov 2012
625 Urbano Drremodel bathroom add ventilation on main floor, toilet & vanity switch location, replce all water suppl line from galvanize to copper pipe, no alter to walls, no structure work
Details
Permit
201208248198
Status
complete
Filed
Aug 24, 2012
Permit issued
Aug 24, 2012
Final sign-off
Nov 5, 2012
Declared cost
$11,000
Address
625 Urbano Dr

remodel bathroom add ventilation on main floor, toilet & vanity switch location, replce all water suppl line from galvanize to copper pipe, no alter to walls, no structure work

Open the permit page

$11,000