Back to bathroom remodel contractors
H.S.B.C. Brother Co
- Based in
- San Jose
- On San Francisco permits
- Apr 2014 to Aug 2014
- Last 24 months
- 0 permits filed
2 permits since 2000: 2 never finaled.
Of the 2 never-finaled permits, 2 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
1 bathroom remodel permit: 1 never finaled. Typically 14 days from filing to permit.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Apr 3, 2014 | Never finaled issued Apr 2014, no final | 50 Rockridge Dr | remodel ground floor to have 1 bedroom, 1 full bathroom, study room. 2/f: replace 3 extg windw at front with new wood doulble pane. 3/f: replace 3 extg operable wndws with new at front,double pane. no changes are proposed to the front facade in regards to off-street parking. all parking will remainDetails
remodel ground floor to have 1 bedroom, 1 full bathroom, study room. 2/f: replace 3 extg windw at front with new wood doulble pane. 3/f: replace 3 extg operable wndws with new at front,double pane. no changes are proposed to the front facade in regards to off-street parking. all parking will remain | $40,000 |