Back to bathroom remodel contractors
H S B C Brother Co
- Based in
- San Jose
- On San Francisco permits
- Jun 2012 to Oct 2013
- Last 24 months
- 0 permits filed
8 permits since 2000: 6 completed, 2 never finaled.
Of the 2 never-finaled permits, 2 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
4 bathroom remodel permits: 3 completed, 1 never finaled. Typically 1 days from filing to permit and 61 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Nov 19, 2012 | Never finaled issued Nov 2012, no final | 168 Caine Av | correction work for complaint cases 201277324 and 201277061. reinstate rear wall of house back to original. remodel kitchen and bathroom at 2nd fl, add new full bath, convert dining room to bedroom. replace 2 new vinyl windows facing backyard. redo non permitted retaining wall at backyard.Details
correction work for complaint cases 201277324 and 201277061. reinstate rear wall of house back to original. remodel kitchen and bathroom at 2nd fl, add new full bath, convert dining room to bedroom. replace 2 new vinyl windows facing backyard. redo non permitted retaining wall at backyard. | $80,000 |
| Nov 5, 2012 | Completed final sign-off Jan 2013 | 436 Elmira St | add 2 bedrooms, 1 home office, 1 bathroom to garage levelDetails
add 2 bedrooms, 1 home office, 1 bathroom to garage level | $48,000 |
| Aug 8, 2012 | Completed final sign-off Dec 2012 | 4207 Folsom St | ground floor. relocate kitchen, add 2 baths, 1 bedroom, living room, and family room. 2nd floor: add new bathroom, repair bedroom sheetrock, dryrot, leakage. update smoke alarms and co detector, add new skylightDetails
ground floor. relocate kitchen, add 2 baths, 1 bedroom, living room, and family room. 2nd floor: add new bathroom, repair bedroom sheetrock, dryrot, leakage. update smoke alarms and co detector, add new skylight | $55,000 |
| Jun 25, 2012 | Completed final sign-off Aug 2012 | 766 Thornton Av | add 2 bedrooms, 1 family room, 1 half bathroom on (e) ground floor (garage) per planDetails
add 2 bedrooms, 1 family room, 1 half bathroom on (e) ground floor (garage) per plan | $35,000 |