H R Construction Services Inc
- Based in
- Pinole
- On San Francisco permits
- Sep 2013 to May 2014
- Last 24 months
- 0 permits filed
4 permits since 2000: 3 completed, 1 never finaled.
Of the 1 never-finaled permit, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| May 6, 2014 | Completed final sign-off Sep 2015 | 1883 29th Av | replace back exterior wall with stucco, open kitchen & dining rm non bearing walls. install new window throughout. reframe all windows framing. install new plumbing throughout. front windows not to be replaced. verify in field non-bearing walls between dining room & living rm.Details
replace back exterior wall with stucco, open kitchen & dining rm non bearing walls. install new window throughout. reframe all windows framing. install new plumbing throughout. front windows not to be replaced. verify in field non-bearing walls between dining room & living rm. | $2,800 |
| Apr 24, 2014 | Completed final sign-off Sep 2015 | 1883 29th Av | remodel kitchen & bathroom on 2nd floor, construct new bedrooms (2) full bathrooms on ground floor.Details
remodel kitchen & bathroom on 2nd floor, construct new bedrooms (2) full bathrooms on ground floor. | $65,000 |
| Nov 21, 2013 | Never finaled issued Nov 2013, no final | 2367 44th Av | comply w/nov #201336211 - revision to pa #2013.0919.7285: new roof replacement (surface material only), install stucco at rear bldg. window replacement rear & front of bldg. front balcony repair in kind & interior staircase landing. u-factor shall not exceed 0.4. garage floor replacementDetails
comply w/nov #201336211 - revision to pa #2013.0919.7285: new roof replacement (surface material only), install stucco at rear bldg. window replacement rear & front of bldg. front balcony repair in kind & interior staircase landing. u-factor shall not exceed 0.4. garage floor replacement | $20,000 |
| Sep 19, 2013 | Completed final sign-off Apr 2014 | 2367 44th Av | remodel kitchen & bathroom at 2nd floor. legalize (e) bedroom & construct new full bathroom on ground floor.Details
remodel kitchen & bathroom at 2nd floor. legalize (e) bedroom & construct new full bathroom on ground floor. | $25,000 |