Back to bathroom remodel contractors
H L S. Inc Dba Wolf General
- Based in
- San Francisco
- On San Francisco permits
- Dec 2002 to Jun 2012
- Last 24 months
- 0 permits filed
34 permits since 2000: 21 completed, 3 never finaled, 10 expired or cancelled.
Of the 3 never-finaled permits, 3 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
5 bathroom remodel permits: 3 completed, 1 never finaled, 1 expired or cancelled. Typically 2 days from filing to permit and 50 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Oct 28, 2011 | Completed final sign-off Dec 2011 | 309 Magellan Av | to comply with nov#20114015- remove old kitchen cabinets & replace with new. remove bathroom fixture & replace with new. (n) lighting comply with cec150(k)Details
to comply with nov#20114015- remove old kitchen cabinets & replace with new. remove bathroom fixture & replace with new. (n) lighting comply with cec150(k) | $19,000 |
| Mar 30, 2011 | Completed final sign-off May 2011 | 1680 Alabama St | remodel extg ground floor garage. install new storage and bathroom. install plywood panels and anchor bolts at ground floor. replace extg garage doors with new roll-up doors.new hydronic heating at occupied spares. install light weight concrete at garage 2.Details
remodel extg ground floor garage. install new storage and bathroom. install plywood panels and anchor bolts at ground floor. replace extg garage doors with new roll-up doors.new hydronic heating at occupied spares. install light weight concrete at garage 2. | $41,363 |
| Mar 15, 2011 | Expired or cancelled cancelled Jan 2026 | 1680 Alabama St | remodel extg ground floor with new yoga studio, bath and storage. voluntary strengthening of extg ground floor. replace extg garage doors with new roll up doors. new hydronic heating and electrical at new occupied spaces.Details
remodel extg ground floor with new yoga studio, bath and storage. voluntary strengthening of extg ground floor. replace extg garage doors with new roll up doors. new hydronic heating and electrical at new occupied spaces. | $25,000 |
| Jun 15, 2007 | Never finaled issued Oct 2007, no final | 425 Liberty St | 25'x13.6" addition to rear of house consisting of: ground floor storage/laundry. 2/f- family room & bath. 3/f- sitting area adj. to (e) master bedroom, new exit stairs and rear yard deck.Details
25'x13.6" addition to rear of house consisting of: ground floor storage/laundry. 2/f- family room & bath. 3/f- sitting area adj. to (e) master bedroom, new exit stairs and rear yard deck. | $160,000 |
| Jul 17, 2006 | Completed final sign-off Nov 2006 | 1329 Noe St | replace stair from family room to 1/f in kind.upgrade interior finishes @family room existing.upgrade garage to 1 hr. rating,replace 2 dryrot windows & door @ family room,replace furnace,add laundry & bath,hydronic heating.no work visable to streetDetails
replace stair from family room to 1/f in kind.upgrade interior finishes @family room existing.upgrade garage to 1 hr. rating,replace 2 dryrot windows & door @ family room,replace furnace,add laundry & bath,hydronic heating.no work visable to street | $50,000 |