Back to bathroom remodel contractors
H. Galan Construction
- Based in
- San Mateo
- On San Francisco permits
- Feb 2004 to Nov 2025
- Last 24 months
- 1 permit filed
3 permits since 2000: 1 completed, 1 never finaled, 1 expired or cancelled.
Of the 1 never-finaled permit, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
1 bathroom remodel permit: 1 never finaled. Typically 171 days from filing to permit.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Mar 30, 2009 | Never finaled issued Sep 2009, no final | 1296 Shotwell St | installation of spray booth and remodel/enlarge (e) office. re-tile bathrooms, replace bathroom fixtures. fix only the ramp and modify doorwayDetails
installation of spray booth and remodel/enlarge (e) office. re-tile bathrooms, replace bathroom fixtures. fix only the ramp and modify doorway | $8,000 |