Back to bathroom remodel contractors
H Construction Co
- Based in
- San Francisco
- On San Francisco permits
- Sep 2008 to Sep 2026
- Last 24 months
- 4 permits filed
60 permits since 2000: 51 completed, 1 in progress, 4 never finaled, 4 expired or cancelled.
Of the 4 never-finaled permits, 1 is 3 to 5 years old, 1 is 5 to 10 years old, 2 are over 10 years old. 1 was filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
14 bathroom remodel permits: 12 completed, 1 never finaled, 1 expired or cancelled. Typically 275 days from filing to permit and 749 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Nov 30, 2022 | Completed final sign-off Aug 2024 | 1555 Oak St | 2nd flr - unit 2 remodel - relocate (e) kitchen & bath, remodel bedroom, add 1 bath & 2 bedroom per plan.Details
2nd flr - unit 2 remodel - relocate (e) kitchen & bath, remodel bedroom, add 1 bath & 2 bedroom per plan. | $50,000 |
| Mar 31, 2021 | Completed final sign-off May 2024 | 1555 Oak St | unit #11: remodel 4th floor. 1 extg bathroom to 2 new bedroom. relocate extg kitchen. relocate extg bath.Details
unit #11: remodel 4th floor. 1 extg bathroom to 2 new bedroom. relocate extg kitchen. relocate extg bath. | $70,000 |
| Oct 21, 2020 | Completed final sign-off Feb 2023 | 1555 Oak St | unit #5/3rd flr remodel: 1(e) bedroom to 2(n) bedrooms. 1(e) bathroom to 2(n) bathrooms. relocate (e) kitchen. (n) window (visible from street). must comply with sffc 1103.7.6.1: fire alarm modification under separate permit.Details
unit #5/3rd flr remodel: 1(e) bedroom to 2(n) bedrooms. 1(e) bathroom to 2(n) bathrooms. relocate (e) kitchen. (n) window (visible from street). must comply with sffc 1103.7.6.1: fire alarm modification under separate permit. | $60,000 |
| Sep 3, 2020 | Completed final sign-off Feb 2023 | 1555 Oak St | unit #10 remodel: 1 existing bedroom to 3 new bedrooms. 1 existing bathroom to 2 new bathrooms. relocate existing kitchen.Details
unit #10 remodel: 1 existing bedroom to 3 new bedrooms. 1 existing bathroom to 2 new bathrooms. relocate existing kitchen. | $60,000 |
| Nov 20, 2019 | Completed final sign-off Feb 2023 | 1555 Oak St | remodel unit# 4. 1 (e) bedroom to 3 new bedrooms. replace 1 new casement window - match (e) window. visible from street. relocate kitchen & bathroom. n new bathroom. replace 1 new window (not visiable from street).Details
remodel unit# 4. 1 (e) bedroom to 3 new bedrooms. replace 1 new casement window - match (e) window. visible from street. relocate kitchen & bathroom. n new bathroom. replace 1 new window (not visiable from street). | $80,000 |
| Nov 20, 2019 | Completed final sign-off Mar 2024 | 1555 Oak St | unit #9: remodel unit. one existing bedroom to two new bedrooms. relocating kitchen & bathroom.Details
unit #9: remodel unit. one existing bedroom to two new bedrooms. relocating kitchen & bathroom. | $50,000 |
| Nov 20, 2019 | Expired or cancelled expired Nov 2024 | 1555 Oak St | unit #6: remodel unit. one existing bedroom to three new bedrooms. relocating kitchen & bathroom. replace 1 new window (double-hung) to match existing window (egress), not visible from street. add new bathroomDetails
unit #6: remodel unit. one existing bedroom to three new bedrooms. relocating kitchen & bathroom. replace 1 new window (double-hung) to match existing window (egress), not visible from street. add new bathroom | $50,000 |
| Nov 20, 2019 | Completed final sign-off Feb 2023 | 1555 Oak St | unit #7: remodel unit. one existing bedroom to two new bedrooms. relocating kitchen & bathroomDetails
unit #7: remodel unit. one existing bedroom to two new bedrooms. relocating kitchen & bathroom | $50,000 |
| Nov 20, 2019 | Completed final sign-off Feb 2023 | 1555 Oak St | unit #3: remodel unit. one existing bedroom to two new bedrooms. relocating kitchen & bathroomDetails
unit #3: remodel unit. one existing bedroom to two new bedrooms. relocating kitchen & bathroom | $50,000 |
| Jun 14, 2017 | Completed final sign-off Aug 2021 | 1251 08th Av | add unit per ordinance no. 162-16. add 2 units. unit#1 & unit#2 have 1 new bathroom , 1 new kitchen, & 1 new bedroom. fire alarm and sprinklers deferred.Details
add unit per ordinance no. 162-16. add 2 units. unit#1 & unit#2 have 1 new bathroom , 1 new kitchen, & 1 new bedroom. fire alarm and sprinklers deferred. | $150,000 |
| Oct 28, 2016 | Never finaled issued Apr 2017, no final | 2763 Filbert St | revision to 201305287983 reconfigure 2nd egress stair to enclose area of (e) exterior stair with new interior stairs from garage to 3rd flr. new bath and laundry room at garage levelDetails
revision to 201305287983 reconfigure 2nd egress stair to enclose area of (e) exterior stair with new interior stairs from garage to 3rd flr. new bath and laundry room at garage level | $48,000 |
| Apr 9, 2013 | Completed final sign-off Oct 2025 | 208 Girard St | 2 story horizontal addition. 682 sq. ft. @ 2nd floor & 672 at 1st floor. raise (e) house 2' & add new 615 sq. ft. basement garage. add 3 bedrooms, 2 study, 3 new bathrooms, 1 kitchen & 1 living room.Details
2 story horizontal addition. 682 sq. ft. @ 2nd floor & 672 at 1st floor. raise (e) house 2' & add new 615 sq. ft. basement garage. add 3 bedrooms, 2 study, 3 new bathrooms, 1 kitchen & 1 living room. | $80,000 |
| Apr 8, 2011 | Completed final sign-off Mar 2013 | 325 Bosworth St | rear yard horizontal addition to create family room, den, laundray and bathroom at ground level. 2nd story infill additon at stairs only.Details
rear yard horizontal addition to create family room, den, laundray and bathroom at ground level. 2nd story infill additon at stairs only. | $120,000 |
| Sep 8, 2008 | Completed final sign-off Jun 2011 | 485 Corbett Av | remodel each level of an e single family dwelling and add 1 additional unit with a single car garage. unit 3: 2/bdrms, 2 1/2 baths. build into required rear yard per variance 20080722v.new decks at rear, new garage doors and front entry. n sprinkler system under sep permitDetails
remodel each level of an e single family dwelling and add 1 additional unit with a single car garage. unit 3: 2/bdrms, 2 1/2 baths. build into required rear yard per variance 20080722v.new decks at rear, new garage doors and front entry. n sprinkler system under sep permit | $415,000 |