Back to bathroom remodel contractors
Gvd Renovations Inc
- Based in
- Roseville
- On San Francisco permits
- Sep 2021 to Jan 2026
- Last 24 months
- 3 permits filed
10 permits since 2000: 7 completed, 1 in progress, 2 never finaled.
Of the 2 never-finaled permits, 1 is 3 to 5 years old, 1 is 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
1 bathroom remodel permit: 1 completed. Typically 0 days from filing to permit and 141 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jan 13, 2026 | Completed final sign-off Jun 2026 | 26 Rockridge Dr | 2nd story: remove existing appliances, remove non load bearing wall, demo countertops, cabinets, floors. upgrade elec and install recessed led lights. new cab,countertops flooring. reinstall appliances.3rd story:bath renovation demo ex shower,tub, vanity floors. upgrade plumbing,elec,humidity sensorDetails
2nd story: remove existing appliances, remove non load bearing wall, demo countertops, cabinets, floors. upgrade elec and install recessed led lights. new cab,countertops flooring. reinstall appliances.3rd story:bath renovation demo ex shower,tub, vanity floors. upgrade plumbing,elec,humidity sensor | $115,280 |