Gt Renovations
- Based in
- Millbrae
- On San Francisco permits
- Apr 2022 to Aug 2023
- Last 24 months
- 0 permits filed
8 permits since 2000: 7 completed, 1 never finaled.
Of the 1 never-finaled permit, 1 is 3 to 5 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 28, 2023 | Completed final sign-off Nov 2023 | 357 Allison St | bathroom renovations: remove tub and tile , remove shower, toilet and vanity. install new tub and new shower, new tile on floor new toilet and vanity. install 2 new recessed lights and fan.Details
bathroom renovations: remove tub and tile , remove shower, toilet and vanity. install new tub and new shower, new tile on floor new toilet and vanity. install 2 new recessed lights and fan. | $19,000 |
| Jul 19, 2023 | Completed final sign-off Aug 2023 | 2780 19th Av | remove (e) shower enclosure and replace with new tile and shower door, replace exhaust fan. remove old drywall in shower and install new.Details
remove (e) shower enclosure and replace with new tile and shower door, replace exhaust fan. remove old drywall in shower and install new. | $15,000 |
| Mar 29, 2023 | Completed final sign-off Jun 2023 | 601 Van Ness Av | unit 43: remodel master bath: replace toilet, vanity, sconce, new shower and tile. 82" x 82" = 47 sf. guest bath: replace toilet, vanity, scone light, new tub and tile. 60" x 98" = 41 sf.Details
unit 43: remodel master bath: replace toilet, vanity, sconce, new shower and tile. 82" x 82" = 47 sf. guest bath: replace toilet, vanity, scone light, new tub and tile. 60" x 98" = 41 sf. | $20,000 |
| Mar 2, 2023 | Completed final sign-off May 2023 | 601 Van Ness Av | master bath: replacing vanity, scone light, replace tub and shower door new tile in tub and floor, new outlet for bidet toliet: guest bath: replacing vanity, scone light, replace shower base and walls, new tile in floor and new outlet for bidet toilet.Details
master bath: replacing vanity, scone light, replace tub and shower door new tile in tub and floor, new outlet for bidet toliet: guest bath: replacing vanity, scone light, replace shower base and walls, new tile in floor and new outlet for bidet toilet. | $20,000 |
| Jan 9, 2023 | Completed final sign-off Feb 2023 | 2780 19th Av | master bath: replacing bath tub with a shower, new toilet and new floor tile, and paint, new exhaust fan and new scone light. guest bath: replacing tub with a new one. new toilet, new floor tile, new exhaust fan, new scone light and paintDetails
master bath: replacing bath tub with a shower, new toilet and new floor tile, and paint, new exhaust fan and new scone light. guest bath: replacing tub with a new one. new toilet, new floor tile, new exhaust fan, new scone light and paint | $20,000 |
| Jun 1, 2022 | Never finaled issued Jun 2022, no final | 601 Van Ness Av | apt 351 -in existing bathroom -installation of new shower/ tub combo with prefab walls, installation of new tile floor 30sqft, replace light switch replace scone light, replace gfci, paint deiling walls inside bathroom.Details
apt 351 -in existing bathroom -installation of new shower/ tub combo with prefab walls, installation of new tile floor 30sqft, replace light switch replace scone light, replace gfci, paint deiling walls inside bathroom. | $11,754 |
| May 16, 2022 | Completed final sign-off Sep 2022 | 2256 Bryant St | unit 2: 3/f: one 40 sq.ft. 3/4 guest bathroom remodel. no structural. no changes to walls or openings. replace existing with new curbed shower, toilet, and vanity. all new fixtures finishes.Details
unit 2: 3/f: one 40 sq.ft. 3/4 guest bathroom remodel. no structural. no changes to walls or openings. replace existing with new curbed shower, toilet, and vanity. all new fixtures finishes. | $14,500 |
| Apr 28, 2022 | Completed final sign-off Sep 2022 | 2256 Bryant St | (1) 71 sqft master bathroom remodel on 3rd floor. no structural, no changes to walls or openings. replace existing with (n) tub/shower, double vanity + toilet. all (n) fixtures + finishes.Details
(1) 71 sqft master bathroom remodel on 3rd floor. no structural, no changes to walls or openings. replace existing with (n) tub/shower, double vanity + toilet. all (n) fixtures + finishes. | $14,500 |