Groundbreaking Landscapes
- Based in
- Mill Valley
- On San Francisco permits
- Sep 2002 to Oct 2022
- Last 24 months
- 0 permits filed
8 permits since 2000: 6 completed, 2 expired or cancelled.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Deck permits
2 deck permits: 2 completed. Typically 98 days from filing to permit and 84 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Nov 2, 2015 | Completed final sign-off Jul 2016 | 517 Day St | reconstruction of existing wood deck, 24" above grade. installation of therapeutic spa in backyardDetails
reconstruction of existing wood deck, 24" above grade. installation of therapeutic spa in backyard | $60,000 |
| Jun 25, 2009 | Completed final sign-off Oct 2009 | 283 Juanita Wy | rear yard only: new low voltage lighting power for pre-tub/spa (400 gal.). relocate rear exit door, new decking on grade less than 30" high.Details
rear yard only: new low voltage lighting power for pre-tub/spa (400 gal.). relocate rear exit door, new decking on grade less than 30" high. | $20,000 |