Back to bathroom remodel contractors
Grip Art Inc. Dba Jan Heyneker Custom Wk
- Based in
- San Francisco
- On San Francisco permits
- May 2011 to Dec 2023
- Last 24 months
- 0 permits filed
21 permits since 2000: 19 completed, 1 never finaled, 1 expired or cancelled.
Of the 1 never-finaled permit, 1 is 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
12 bathroom remodel permits: 11 completed, 1 never finaled. Typically 0 days from filing to permit and 192 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Dec 18, 2023 | Completed final sign-off Apr 2025 | 132 Fairmount St | revision to permit 202306140116. interior remodel of (e) bathroom. no bathroom addition, revised closet, ceiling framing, door/window, skylight changes. no change to building footprint.Details
revision to permit 202306140116. interior remodel of (e) bathroom. no bathroom addition, revised closet, ceiling framing, door/window, skylight changes. no change to building footprint. | |
| Jun 14, 2023 | Completed final sign-off Apr 2025 | 132 Fairmount St | interior remodel of existing bathroom, and additional bathroom. new exterior doors at rear facade. no change to building footprint. additional 4 new skylights.Details
interior remodel of existing bathroom, and additional bathroom. new exterior doors at rear facade. no change to building footprint. additional 4 new skylights. | $200,000 |
| Mar 15, 2023 | Completed final sign-off Apr 2025 | 132 Fairmount St | insulate & drywall garage & trade ent. replace garage door and trade door in kind remodel 1/2 bath an main bath in kind replace 2 windows on 2nd floor in kind replace 1 skylight inkind replace 2 french doors on 1st flr 1 french door 2nd flr in kindDetails
insulate & drywall garage & trade ent. replace garage door and trade door in kind remodel 1/2 bath an main bath in kind replace 2 windows on 2nd floor in kind replace 1 skylight inkind replace 2 french doors on 1st flr 1 french door 2nd flr in kind | $40,000 |
| Dec 10, 2021 | Completed final sign-off Oct 2023 | 375 Park St | revision to bpa#2021/0922/8960.including (n)fire-rated property rated wall,exterior entry stair replacement like for like,window replacement(9)interior renovation including full bath & (n) half bath.Details
revision to bpa#2021/0922/8960.including (n)fire-rated property rated wall,exterior entry stair replacement like for like,window replacement(9)interior renovation including full bath & (n) half bath. | $15,000 |
| Oct 8, 2020 | Completed final sign-off Jun 2021 | 338 Park St | addition of 3 dormers incl a (n) erd flr full bathroom and 2 closetsDetails
addition of 3 dormers incl a (n) erd flr full bathroom and 2 closets | $20,000 |
| Jan 31, 2020 | Completed final sign-off Mar 2020 | 718 15th Av | replace tub and sink, add electrical circuits and toilet. replace tile. 5.5'x7' bathDetails
replace tub and sink, add electrical circuits and toilet. replace tile. 5.5'x7' bath | $20,000 |
| Jan 12, 2018 | Never finaled issued Jan 2018, no final | 256 Hermann St | remodel (1) kitchen and upstairs (1) bath in kind with no plan changes. plumbing inspection for new shower pan. (no change of (e) layout)Details
remodel (1) kitchen and upstairs (1) bath in kind with no plan changes. plumbing inspection for new shower pan. (no change of (e) layout) | $20,500 |
| Jul 19, 2016 | Completed final sign-off Nov 2016 | 262 Connecticut St | remodel upstairs 1 full bathroom @ 3/f aka top level.Details
remodel upstairs 1 full bathroom @ 3/f aka top level. | $27,200 |
| Apr 15, 2014 | Completed final sign-off Oct 2014 | 60 Elgin Pk | remodel kitchen & 2nd bath to bring to current code. kitchen lighting min 50% total wattage high efficacy, bathroomlighting high efficacy unless controlled by manual on occupancy sensors.Details
remodel kitchen & 2nd bath to bring to current code. kitchen lighting min 50% total wattage high efficacy, bathroomlighting high efficacy unless controlled by manual on occupancy sensors. | $65,000 |
| Feb 1, 2013 | Completed final sign-off Jul 2013 | 91 Stoneyford Av | remodel one bath on upper level. switch out vanity tile and tub, and toilet. voluntary upgrade per title 24, bathroom lighting shall be electrical. high efficacy or controlled by manual on sensors.Details
remodel one bath on upper level. switch out vanity tile and tub, and toilet. voluntary upgrade per title 24, bathroom lighting shall be electrical. high efficacy or controlled by manual on sensors. | $9,000 |
| Sep 16, 2011 | Completed final sign-off Jan 2012 | 1143 Fell St | convert 1/2 bath to full bath, to include showerDetails
convert 1/2 bath to full bath, to include shower | $13,000 |
| May 5, 2011 | Completed final sign-off Dec 2012 | 3847 22nd St | to comply w/nov #200450942 - repair stairs at front less than 50%. demo (e) first floor closet & replace with new full bathroom.Details
to comply w/nov #200450942 - repair stairs at front less than 50%. demo (e) first floor closet & replace with new full bathroom. | $15,000 |