Back to bathroom remodel contractors
Gregory Santos
- Based in
- Concord
- On San Francisco permits
- Jul 2021 to Apr 2024
- Last 24 months
- 0 permits filed
14 permits since 2000: 14 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
7 bathroom remodel permits: 7 completed. Typically 0 days from filing to permit and 118 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Apr 30, 2024 | Completed final sign-off Jul 2024 | 3887 25th St | bathroom remodel, like for like kind. replace kitchen countertops; no other work in kitchen. no walls to be removed or added.Details
bathroom remodel, like for like kind. replace kitchen countertops; no other work in kitchen. no walls to be removed or added. | $30,000 |
| Nov 9, 2023 | Completed final sign-off Mar 2024 | 10 Wilder St | create a rooms down with media room, wet bar & bathroom on 1st fl.Details
create a rooms down with media room, wet bar & bathroom on 1st fl. | $80,000 |
| Nov 9, 2023 | Completed final sign-off Mar 2024 | 10 Wilder St | remodel of 1 kitchen and 1 bathroom on 2nd fl. non structural.Details
remodel of 1 kitchen and 1 bathroom on 2nd fl. non structural. | $5,000 |
| Aug 15, 2022 | Completed final sign-off Jan 2025 | 215 San Leandro Wy | kitchen & 2 bathrooms remoded in-kind. ~130 sqft. not moving walls. no structural work.Details
kitchen & 2 bathrooms remoded in-kind. ~130 sqft. not moving walls. no structural work. | $50,000 |
| Apr 4, 2022 | Completed final sign-off Jul 2022 | 710 Cayuga Av | remodel kitchen like for like kind. remodel bathroom like for like kind. no structural/wall/framing modificationsDetails
remodel kitchen like for like kind. remodel bathroom like for like kind. no structural/wall/framing modifications | $30,000 |
| Dec 6, 2021 | Completed final sign-off May 2022 | 2628 Laguna St | remove damaged ceiling plaster, replace w/ sheetrock. install can lights, switches, outlets. replace faucet & ptrap in (1) bathroom.Details
remove damaged ceiling plaster, replace w/ sheetrock. install can lights, switches, outlets. replace faucet & ptrap in (1) bathroom. | $35,000 |
| Jul 28, 2021 | Completed final sign-off Dec 2021 | 91 Belcher St | remodel one kitchen & one bathroom, in kind like for like. no walls or openings will be altered. layout remained outchanged. no alteration of wall, window and door.Details
remodel one kitchen & one bathroom, in kind like for like. no walls or openings will be altered. layout remained outchanged. no alteration of wall, window and door. | $25,000 |