Back to bathroom remodel contractors
Greenworks
- Based in
- San Ramon
- On San Francisco permits
- Sep 2012 to Jan 2014
- Last 24 months
- 0 permits filed
28 permits since 2000: 2 completed, 21 never finaled, 5 expired or cancelled.
Of the 21 never-finaled permits, 21 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
10 bathroom remodel permits: 10 never finaled. Typically 0 days from filing to permit.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Oct 1, 2013 | Never finaled issued Oct 2013, no final | 781 36th Av | replace bath tub same location repair walls & floors new circuit & shower valve. no structural changes, walk in tubDetails
replace bath tub same location repair walls & floors new circuit & shower valve. no structural changes, walk in tub | $3,500 |
| Oct 1, 2013 | Never finaled issued Oct 2013, no final | 234 Minerva St | replace bath tub shower valve and circuit, replar floor & walls, no structural changes walk in tubDetails
replace bath tub shower valve and circuit, replar floor & walls, no structural changes walk in tub | $3,500 |
| Sep 9, 2013 | Never finaled issued Sep 2013, no final | 1 Federal St | replace bath tub with walk in tub, replace shower valve, add circuit repair, floors & walls, no structural changes.Details
replace bath tub with walk in tub, replace shower valve, add circuit repair, floors & walls, no structural changes. | $3,500 |
| Dec 21, 2012 | Never finaled issued Dec 2012, no final | 65 Potomac St | replace tub with walk in tub into existing opening, no structural changes. drywall & floor repairs and replace bathroom door.Details
replace tub with walk in tub into existing opening, no structural changes. drywall & floor repairs and replace bathroom door. | $5,000 |
| Oct 31, 2012 | Never finaled issued Oct 2012, no final | 462 Orizaba Av | replace bathroom door and tub. repair drywall. no structural changesDetails
replace bathroom door and tub. repair drywall. no structural changes | $1,000 |
| Oct 31, 2012 | Never finaled issued Oct 2012, no final | 1724 Pacheco St | replace bathroom door, tub. drywall repair. no structuralDetails
replace bathroom door, tub. drywall repair. no structural | $1,000 |
| Oct 31, 2012 | Never finaled issued Oct 2012, no final | 502 Nevada St | replce bathroom door and tub,repair drywall. no structural changes.Details
replce bathroom door and tub,repair drywall. no structural changes. | $1,000 |
| Oct 30, 2012 | Never finaled issued Oct 2012, no final | 1638 44th Av | replace bathroom door & tub, repair drywall.Details
replace bathroom door & tub, repair drywall. | $1,000 |
| Oct 30, 2012 | Never finaled issued Oct 2012, no final | 1215 Stanyan St | replace bathroom door & tub, repair drywall. no structural changes.Details
replace bathroom door & tub, repair drywall. no structural changes. | $1,000 |
| Sep 24, 2012 | Never finaled issued Sep 2012, no final | 1940 Silver Av | replace bathroom door in kind.Details
replace bathroom door in kind. | $500 |