Permit GraphShortlistSan Francisco building permits since 2000

Greener Excavations & Construction

Contractor license
872648
State license record
Based in
San Francisco
On San Francisco permits
Dec 2010 to Mar 2020
Last 24 months
0 permits filed

3 permits since 2000: 3 completed.

CompletedIn progressNever finaledExpired or cancelled

This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records

Permits filed each year

How long permits take

Median days to final inspection, citywideMedian days to permit issued, citywide

Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.

Most recent permits

All
FiledOutcomeAddressWork described on the permitDeclared cost
Mar 16, 2020Completed
final sign-off Mar 2022
1208 Lombard Sttemporary shoring to accomodate excavation for new basement construction at 1210 lombard st.
Details
Permit
202003167108
Status
complete
Filed
Mar 16, 2020
Permit issued
Jun 19, 2020
Final sign-off
Mar 2, 2022
Declared cost
$200,000
Address
1208 Lombard St

temporary shoring to accomodate excavation for new basement construction at 1210 lombard st.

Open the permit page

$200,000
May 16, 2016Completed
final sign-off May 2024
1210 Lombard Stremodel all interior. excavate to add basement. rear addition, (e) lightwell reconfiguration, add (n) lightwell @ 2nd/3rd floor, add garden room @ basement level, convert a portion of (e) building @ second level to (n) garage.
Details
Permit
201605167513
Status
complete
Filed
May 16, 2016
Permit issued
Jul 31, 2018
Final sign-off
May 30, 2024
Declared cost
$900,000
Address
1210 Lombard St

remodel all interior. excavate to add basement. rear addition, (e) lightwell reconfiguration, add (n) lightwell @ 2nd/3rd floor, add garden room @ basement level, convert a portion of (e) building @ second level to (n) garage.

Open the permit page

$900,000
Dec 22, 2010Completed
final sign-off Nov 2011
2939 Vallejo Stnew back retaining wall to excavate extg crawl space.lower level ceiling framing modification. lower level seismic strengthening.
Details
Permit
201012227213
Status
complete
Filed
Dec 22, 2010
Permit issued
Dec 28, 2010
Final sign-off
Nov 3, 2011
Declared cost
$50,000
Address
2939 Vallejo St

new back retaining wall to excavate extg crawl space.lower level ceiling framing modification. lower level seismic strengthening.

Open the permit page

$50,000