Green Planet Remodelling Inc
- Based in
- San Jose
- On San Francisco permits
- May 2018 to Sep 2024
- Last 24 months
- 0 permits filed
12 permits since 2000: 9 completed, 3 never finaled.
Of the 3 never-finaled permits, 3 are 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 10, 2024 | Completed final sign-off May 2025 | 1374 Quesada Av | wall removal. cancel window. kichen remodeling: relocate sink and dishwasher. replace cabinets, appliances bathroom. remodeling like to like. relocate laundry unit to bathroom.Details
wall removal. cancel window. kichen remodeling: relocate sink and dishwasher. replace cabinets, appliances bathroom. remodeling like to like. relocate laundry unit to bathroom. | $90,000 |
| Sep 11, 2023 | Completed final sign-off Jan 2024 | 11 Eugenia Av | non structural (2) bathrooms remodelings. bath #1: convert tub to shower. replace toilet, replace sink. bath #2: remodel shower, replace toilet, replace sink.Details
non structural (2) bathrooms remodelings. bath #1: convert tub to shower. replace toilet, replace sink. bath #2: remodel shower, replace toilet, replace sink. | $47,800 |
| Dec 27, 2019 | Never finaled issued Dec 2019, no final | 1817 California St | street spaceDetails
street space | |
| Sep 10, 2019 | Completed final sign-off Feb 2020 | 1817 California St | unit 1e - added scope to pa 2019-0513-0498 - remodel second bathroom in condo like for like; bathroom remodel approx 95 sf. no structural work. no changes to wall layoutDetails
unit 1e - added scope to pa 2019-0513-0498 - remodel second bathroom in condo like for like; bathroom remodel approx 95 sf. no structural work. no changes to wall layout | $14,981 |
| Jun 12, 2019 | Completed final sign-off Jun 2021 | 98 Sotelo Av | remodel kitchen & relocate powder roomDetails
remodel kitchen & relocate powder room | $60,000 |
| Apr 10, 2019 | Completed final sign-off Jun 2019 | 2807 Market St | bathroom remodel convert tub to shower, relocate vanity. no structural work, no wall/framing modificationsDetails
bathroom remodel convert tub to shower, relocate vanity. no structural work, no wall/framing modifications | $22,000 |
| Sep 26, 2018 | Completed final sign-off Mar 2019 | 250 Bridgeview Dr | 2 bathroom remodel, relocate plumbing wall removal, replace door and window (not visible from street)Details
2 bathroom remodel, relocate plumbing wall removal, replace door and window (not visible from street) | $30,000 |
| Aug 30, 2018 | Completed final sign-off Nov 2018 | 501 Rockdale Dr | revision to pa# 201807235180. changing tub to shower.Details
revision to pa# 201807235180. changing tub to shower. | |
| Aug 17, 2018 | Completed final sign-off Dec 2018 | 20 Littlefield Tr | bathroom remodel. ( convert tub to shower, add new toilet replace sink.)Details
bathroom remodel. ( convert tub to shower, add new toilet replace sink.) | $25,500 |
| Jul 23, 2018 | Completed final sign-off Nov 2018 | 501 Rockdale Dr | interior remodel to legalize existing family room; remodel (e) bath and storage area, all woork on 1st fl.; add side property line facing window not visible from street.Details
interior remodel to legalize existing family room; remodel (e) bath and storage area, all woork on 1st fl.; add side property line facing window not visible from street. | $34,000 |
| May 29, 2018 | Never finaled issued May 2018, no final | 4751 25th St | kitchen remodel in-kind.Details
kitchen remodel in-kind. | $34,000 |
| May 29, 2018 | Never finaled issued May 2018, no final | 4751 25th St | 2 window replacement (retro fit) stainless steel windows.Details
2 window replacement (retro fit) stainless steel windows. | $2,000 |