Back to bathroom remodel contractors
Green Engineered Stone Distributors Inc
- Based in
- Stockton
- On San Francisco permits
- Dec 2011 to Oct 2013
- Last 24 months
- 0 permits filed
6 permits since 2000: 4 completed, 2 never finaled.
Of the 2 never-finaled permits, 2 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
4 bathroom remodel permits: 3 completed, 1 never finaled. Typically 0 days from filing to permit and 163 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 19, 2013 | Never finaled issued Sep 2013, no final | 1487 21st Av | remove & replace like for like light fixtures, toilet, pedestal sink, tlie floors & walls, bathtub shower valve, light switches, gfci, exhaust fan, paint bathroom. densheild water proof backer board, marblestone solid surface shower walls.Details
remove & replace like for like light fixtures, toilet, pedestal sink, tlie floors & walls, bathtub shower valve, light switches, gfci, exhaust fan, paint bathroom. densheild water proof backer board, marblestone solid surface shower walls. | $10,000 |
| Jun 26, 2013 | Completed final sign-off Dec 2013 | 2090 Great Hy | bath remodel: like for like, new pan, tile walls, valve, floor tile, toilet, vanity,. new supply and drain for washer and exhaust fan. gfci circuit and occ sensor for light. ventless dryer. drain condensate to floor drain.Details
bath remodel: like for like, new pan, tile walls, valve, floor tile, toilet, vanity,. new supply and drain for washer and exhaust fan. gfci circuit and occ sensor for light. ventless dryer. drain condensate to floor drain. | $12,000 |
| Mar 18, 2013 | Completed final sign-off Aug 2013 | 943 Clayton St | demo 2 bathrooms: #1 - new cabinet, new countertop, new faucet, new floor, new toilet, new exhaust fan. #2 - new shower pan, new shower valve, new wallboard, new cabinet, new countertop, new faucet, new floor, new toilet.Details
demo 2 bathrooms: #1 - new cabinet, new countertop, new faucet, new floor, new toilet, new exhaust fan. #2 - new shower pan, new shower valve, new wallboard, new cabinet, new countertop, new faucet, new floor, new toilet. | $15,000 |
| Dec 22, 2011 | Completed final sign-off Mar 2012 | 3715 24th St | replace (e) tub/shower faucet/vanity faucet, new shower pan, marble shower walls & wainscot, tile floor. new dry wall in wet wall area, no wal relocation. permanently installed lights where required in bathroom shall be high efficacy unless they are controlled by manual on occupancy sensors.Details
replace (e) tub/shower faucet/vanity faucet, new shower pan, marble shower walls & wainscot, tile floor. new dry wall in wet wall area, no wal relocation. permanently installed lights where required in bathroom shall be high efficacy unless they are controlled by manual on occupancy sensors. | $16,731 |