Back to kitchen remodel contractors
Great Ocean Construction Inc.
- Based in
- San Francisco
- On San Francisco permits
- Jun 2022 to Sep 2026
- Last 24 months
- 36 permits filed
57 permits since 2000: 48 completed, 8 in progress, 1 never finaled.
Of the 1 never-finaled permit, 1 is 3 to 5 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
25 kitchen remodel permits: 22 completed, 3 in progress. Typically 13 days from filing to permit and 160 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 20, 2026 | In progress issued Aug 2026 | 44 Stonecrest Dr | 1/fl- remodel and relocate (e) kitchen, bathroom, and remove walls at dining area. replace rear small deck in kind. (n) laundry. 2/fl- remodel (e) bathrooms, replace all (e) windows in kind visible from street.Details
1/fl- remodel and relocate (e) kitchen, bathroom, and remove walls at dining area. replace rear small deck in kind. (n) laundry. 2/fl- remodel (e) bathrooms, replace all (e) windows in kind visible from street. | $137,000 |
| May 13, 2026 | In progress issued May 2026 | 3210 Balboa St | unit 4: remodel kitchen and bathroom, like for like, replace 1 bedroom window and 1 living room window. all facing to the backyard.Details
unit 4: remodel kitchen and bathroom, like for like, replace 1 bedroom window and 1 living room window. all facing to the backyard. | $55,000 |
| Apr 29, 2026 | Completed final sign-off Aug 2026 | 1375 Chestnut St | units 1 and 2: kitchen and bathroom remodels, install lights for living room. unit 3: bathroom and kitchen remodel, new counter tops and back splash only. all work is like for like.Details
units 1 and 2: kitchen and bathroom remodels, install lights for living room. unit 3: bathroom and kitchen remodel, new counter tops and back splash only. all work is like for like. | $55,000 |
| Apr 6, 2026 | In progress issued May 2026 | 2925 Cabrillo St | ground floor remodel: new kitchenette+ bathroom to replace (e). new laundry closet, new wall finish at (e) stair, new rear deck and stair, new siding + trim at rear, no work visible from the street. no expansion to envelope.Details
ground floor remodel: new kitchenette+ bathroom to replace (e). new laundry closet, new wall finish at (e) stair, new rear deck and stair, new siding + trim at rear, no work visible from the street. no expansion to envelope. | $136,600 |
| Dec 26, 2025 | Completed final sign-off Feb 2026 | 171 09th Av | rewiring whole unit patch drywall. kitchen remodel to include install (n) appliances, counter top, and backlash, sink, sink faucet.Details
rewiring whole unit patch drywall. kitchen remodel to include install (n) appliances, counter top, and backlash, sink, sink faucet. | $30,000 |
| Dec 5, 2025 | Completed final sign-off Apr 2026 | 180 San Marcos Av | remodel kitchen, like for like; install new cabinets & countertop, install new appliances; remodel master bathroom like for like; replace shower pan, vanity & toilet; remodel powder room like for like.Details
remodel kitchen, like for like; install new cabinets & countertop, install new appliances; remodel master bathroom like for like; replace shower pan, vanity & toilet; remodel powder room like for like. | $61,000 |
| Dec 5, 2025 | Completed final sign-off Apr 2026 | 120 Beaumont Av | replace 2 kitchen windows and 4 bedroom window kto fiberglass windows all facing to the rear or side , not visabel from the street; remodel kitchen like for like; install kitchen cabinets appliance; lights and plumbing fixture.Details
replace 2 kitchen windows and 4 bedroom window kto fiberglass windows all facing to the rear or side , not visabel from the street; remodel kitchen like for like; install kitchen cabinets appliance; lights and plumbing fixture. | $40,000 |
| Dec 1, 2025 | Completed final sign-off Jun 2026 | 3086 Balboa St | at 2nd fl, interior remodel, reodel (e) kitchen, bathroom, new laundry and remodel (e) living to bedroom.Details
at 2nd fl, interior remodel, reodel (e) kitchen, bathroom, new laundry and remodel (e) living to bedroom. | $87,000 |
| Jul 8, 2025 | Completed final sign-off Aug 2025 | 1926 31st Av | replace kitchen cabinets and countertops like to like, no change in layout. not a full kitchen remodel. all appliances and fixtures to remain. no other work for this permit.Details
replace kitchen cabinets and countertops like to like, no change in layout. not a full kitchen remodel. all appliances and fixtures to remain. no other work for this permit. | $15,500 |
| Jan 13, 2025 | Completed final sign-off Dec 2025 | 2511 37th Av | relocate/remodel (e) laundry & (e) family room, add (n) bedroom & (n) bath, reconfigure interior staircase @ 1/f. relocate skylight. convert (e) bedroom into master suite, remodel (e) living room, relocate (e) kitchen, dining, & bath @ 2/f.Details
relocate/remodel (e) laundry & (e) family room, add (n) bedroom & (n) bath, reconfigure interior staircase @ 1/f. relocate skylight. convert (e) bedroom into master suite, remodel (e) living room, relocate (e) kitchen, dining, & bath @ 2/f. | $200,000 |
| Nov 18, 2024 | Completed final sign-off Jul 2025 | 1200 Sloat Bl | interior remodel of kitchen and bathrooms, add a bathroom, replace front stair and landing, new fence, roofing, add skylightsDetails
interior remodel of kitchen and bathrooms, add a bathroom, replace front stair and landing, new fence, roofing, add skylights | $150,000 |
| Nov 5, 2024 | Completed final sign-off Mar 2025 | 63 Knollview Wy | remodel 1 kitchen, 2 bathrooms on 2nd floor, like for like, replace 2 rear windows facing to backyard, like for like, replace all interior doors, change hallway bathroom entry door to pocket door. windows same size, same location, max u-factor 0.30.Details
remodel 1 kitchen, 2 bathrooms on 2nd floor, like for like, replace 2 rear windows facing to backyard, like for like, replace all interior doors, change hallway bathroom entry door to pocket door. windows same size, same location, max u-factor 0.30. | $53,000 |
| Nov 1, 2024 | Completed final sign-off Apr 2025 | 1330 Valencia St | comply to nov # 202018451 replace front windows and side windows total 24 windows replace rear wood sidings remodel unit c kitchen and wet bar remodel 2 bathromsDetails
comply to nov # 202018451 replace front windows and side windows total 24 windows replace rear wood sidings remodel unit c kitchen and wet bar remodel 2 bathroms | $82,500 |
| Oct 23, 2024 | Completed final sign-off Apr 2025 | 1330 Valencia St | unit a: comply to 202018451; replacing front exterior door & install new lock set. kitchen and bathroom remodel. to include replace 3 windows within the same opening not facing street and replacing siding on side of building in kind.Details
unit a: comply to 202018451; replacing front exterior door & install new lock set. kitchen and bathroom remodel. to include replace 3 windows within the same opening not facing street and replacing siding on side of building in kind. | $52,500 |
| May 15, 2024 | Completed final sign-off Aug 2026 | 6427 California St | 1st fl,expand e garage, add new living sapace with excavation,remodel e laundry at 2nd remove e kitchen and dining rm, lvng rm,add new bath.3rd fl remodel e bdrooms,add 1 new bath. new interior stairDetails
1st fl,expand e garage, add new living sapace with excavation,remodel e laundry at 2nd remove e kitchen and dining rm, lvng rm,add new bath.3rd fl remodel e bdrooms,add 1 new bath. new interior stair | $236,000 |
| Mar 26, 2024 | Completed final sign-off May 2025 | 1625 Vallejo St | remodel main kitchen, 2.5 baths on 3rd fl and 2nd fl. remodel laundry room on 2nd fl. install new lights and new appliances. like to like. no changes to the layout all stays the same.Details
remodel main kitchen, 2.5 baths on 3rd fl and 2nd fl. remodel laundry room on 2nd fl. install new lights and new appliances. like to like. no changes to the layout all stays the same. | $125,000 |
| Mar 18, 2024 | Completed final sign-off Feb 2025 | 2275 26th Av | 1/f: infill below 2/f (e) cantilevered bedroom area, add new home office, family, wet bar and bath. construct (n) interior stair. 2/f: remodel (e) kitchen, dining, bath and bedroom, adding (n) bathroom, laundry and skylights.Details
1/f: infill below 2/f (e) cantilevered bedroom area, add new home office, family, wet bar and bath. construct (n) interior stair. 2/f: remodel (e) kitchen, dining, bath and bedroom, adding (n) bathroom, laundry and skylights. | $236,500 |
| Feb 20, 2024 | Completed final sign-off Jul 2024 | 370 10th Av | 2/f: remodel kitchen, replace rear sliding door leading to (e) deck. ground floor: replace rear sliding door leading to backyard.Details
2/f: remodel kitchen, replace rear sliding door leading to (e) deck. ground floor: replace rear sliding door leading to backyard. | $40,000 |
| Nov 14, 2023 | Completed final sign-off May 2024 | 1868 10th Av | 2/f: kitchen and bathroom remodel. new roof deck and guardrail over (e) legal 2/f bump-out in rear yard. new exterior windows. add doors at rear facade. not visible from street. no increase in floor area.Details
2/f: kitchen and bathroom remodel. new roof deck and guardrail over (e) legal 2/f bump-out in rear yard. new exterior windows. add doors at rear facade. not visible from street. no increase in floor area. | $98,000 |
| Oct 10, 2023 | Completed final sign-off Nov 2024 | 639 25th Av | remodel (e) kitchen, bathroom, and nook on 2/f. construct (n) internal staircase. remodel one (e) bathroom at g/f. construct (n) hallway bathroom, bedroom, laundry room at g/f.Details
remodel (e) kitchen, bathroom, and nook on 2/f. construct (n) internal staircase. remodel one (e) bathroom at g/f. construct (n) hallway bathroom, bedroom, laundry room at g/f. | $100,000 |
| Sep 18, 2023 | Completed final sign-off Sep 2024 | 1252 Funston Av | legalize (e) gym and office on ground floor. ground fl. remodel (e) bath add new kitchenette, add laundry in garage, 3rd fl. remodl (e) kitchen and 1 full bath, add 1 new full bathDetails
legalize (e) gym and office on ground floor. ground fl. remodel (e) bath add new kitchenette, add laundry in garage, 3rd fl. remodl (e) kitchen and 1 full bath, add 1 new full bath | $110,000 |
| Aug 28, 2023 | Completed final sign-off May 2024 | 1847 20th Av | fill in (e) north light well, reconstruct (e) interior stair, provide 3 (n) skylights. 1/f: privide (n) bathroom, 2 (n) bedrooms, (n) family room, (n) deck at rear. 2/f: remodel (e) kitchen and (e) bathroom, provide (n) master room, (n) bathroom.Details
fill in (e) north light well, reconstruct (e) interior stair, provide 3 (n) skylights. 1/f: privide (n) bathroom, 2 (n) bedrooms, (n) family room, (n) deck at rear. 2/f: remodel (e) kitchen and (e) bathroom, provide (n) master room, (n) bathroom. | $189,000 |
| Aug 25, 2023 | Completed final sign-off Oct 2024 | 35 27th Av | full covering (e) court yard to enlarge (e) kitchen, remodel (e) kitchen. new sliding door. half-bathroom remodel.Details
full covering (e) court yard to enlarge (e) kitchen, remodel (e) kitchen. new sliding door. half-bathroom remodel. | $80,000 |
| Jul 11, 2023 | Completed final sign-off Oct 2023 | 2632 Phelps St | remodel one kitchen and 1 bathroom. like for like. change bathtub to walk in shower, install new cabinets and countertop, new vanity, and toilet.Details
remodel one kitchen and 1 bathroom. like for like. change bathtub to walk in shower, install new cabinets and countertop, new vanity, and toilet. | $21,000 |
| Aug 29, 2022 | Completed final sign-off Feb 2024 | 1874 10th Av | interior renovation of e 2 story single family residence. renovation of kitchen, bath, power room. addition of 1 skylight.Details
interior renovation of e 2 story single family residence. renovation of kitchen, bath, power room. addition of 1 skylight. | $100,000 |