Back to bathroom remodel contractors
Gracon Construction Inc
- Based in
- Hayward
- On San Francisco permits
- Mar 2008 to Sep 2025
- Last 24 months
- 3 permits filed
16 permits since 2000: 13 completed, 2 never finaled, 1 expired or cancelled.
Of the 2 never-finaled permits, 1 is 5 to 10 years old, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
7 bathroom remodel permits: 5 completed, 2 never finaled. Typically 0 days from filing to permit and 310 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 2, 2025 | Completed final sign-off Jan 2026 | 442 Mississippi St | remodel master bathroom. replace existing tub with new , replace existing toilet with new , replace existing shower with new , replace existing double sink vanity with new, all new tile floors and 2 wall shower enclosure. all in kind, like for like.Details
remodel master bathroom. replace existing tub with new , replace existing toilet with new , replace existing shower with new , replace existing double sink vanity with new, all new tile floors and 2 wall shower enclosure. all in kind, like for like. | $25,000 |
| Dec 13, 2024 | Completed final sign-off Nov 2025 | 611 Miramar Av | remodel (e) garage to provide additional conditioned space and interior remodel of (e) 2nd floor; 2nd fl: to add closets in 3 bedrooms, infill a staircase, remodel a staircase, and remodel (e) kitchen and (2) bathsDetails
remodel (e) garage to provide additional conditioned space and interior remodel of (e) 2nd floor; 2nd fl: to add closets in 3 bedrooms, infill a staircase, remodel a staircase, and remodel (e) kitchen and (2) baths | $250,000 |
| Jun 15, 2022 | Completed final sign-off Nov 2023 | 2858 22nd St | interior remodel of 2 story sfr expand into lower level garage/storage space to increase habitable space by 1,105 sqft add (3) new bedrooms + bathroom add (n) laundry room.Details
interior remodel of 2 story sfr expand into lower level garage/storage space to increase habitable space by 1,105 sqft add (3) new bedrooms + bathroom add (n) laundry room. | $160,000 |
| May 3, 2021 | Completed final sign-off Apr 2023 | 631 Ofarrell St | unit #803: one kitchen & one bath remodel.Details
unit #803: one kitchen & one bath remodel. | $50,000 |
| Mar 11, 2021 | Never finaled issued Mar 2021, no final | 631 O'farrell St | kitchen remodel, like for like (cabinets/countertops) tile one wall in bathroomDetails
kitchen remodel, like for like (cabinets/countertops) tile one wall in bathroom | $25,000 |
| Apr 8, 2015 | Completed final sign-off Jan 2016 | 147 20th Av | remodel existing bathroom, convert closet into bathroom - all work in 2nd floorDetails
remodel existing bathroom, convert closet into bathroom - all work in 2nd floor | $5,000 |
| Jun 25, 2013 | Never finaled issued Jun 2013, no final | 239 Faxon Av | remodel two bathrooms and dkitchen. all like for like.Details
remodel two bathrooms and dkitchen. all like for like. | $30,000 |