Grabher Construction
- Based in
- Lafayette
- On San Francisco permits
- Feb 2021 to May 2026
- Last 24 months
- 2 permits filed
11 permits since 2000: 11 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
2 bathroom remodel permits: 2 completed. Typically 2 days from filing to permit and 142 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Mar 18, 2024 | Completed final sign-off May 2024 | 645 Central Av | unit 645 and 647 -removal of (e) w&d in the basement. install (n) w&d and tankless water heater to the (e) utlitly room for each unit. replace tub/shower tile surround walls in kind in bathroom at upper dwelling unit.Details
unit 645 and 647 -removal of (e) w&d in the basement. install (n) w&d and tankless water heater to the (e) utlitly room for each unit. replace tub/shower tile surround walls in kind in bathroom at upper dwelling unit. | $23,500 |
| Mar 29, 2022 | Completed final sign-off Nov 2022 | 926 Teresita Bl | removal of interior utility stair between the garage and 2/f, floor infill at the 2/f where the stair is removed, and addition of a half bath at the infill.Details
removal of interior utility stair between the garage and 2/f, floor infill at the 2/f where the stair is removed, and addition of a half bath at the infill. | $15,000 |