Back to bathroom remodel contractors
Gordon Construction
- Based in
- San Carlos
- On San Francisco permits
- May 2004 to Jan 2019
- Last 24 months
- 0 permits filed
10 permits since 2000: 9 completed, 1 expired or cancelled.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
4 bathroom remodel permits: 4 completed. Typically 10 days from filing to permit and 337 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Apr 17, 2018 | Completed final sign-off Feb 2020 | 70 Forest Side Av | kitchen remodel with new windows (not visible from street)- door, no wall changes. bath #1 & bath #2 remodel - 1 wall moving. add doorst closet to lower level. dry rot in foundation wall - add foundation bolts.Details
kitchen remodel with new windows (not visible from street)- door, no wall changes. bath #1 & bath #2 remodel - 1 wall moving. add doorst closet to lower level. dry rot in foundation wall - add foundation bolts. | $100,000 |
| Jun 1, 2015 | Completed final sign-off Sep 2016 | 76 Forest Side Av | excavation for installation of habitable space on gr fl. no work 2nd or 3rd fl. install 1 bedroosm, 1 bath, 1 family room ground floorDetails
excavation for installation of habitable space on gr fl. no work 2nd or 3rd fl. install 1 bedroosm, 1 bath, 1 family room ground floor | $50,000 |
| Feb 23, 2015 | Completed final sign-off Jul 2015 | 76 Forest Side Av | demo fixtures/finishes in downstairs extra bathroom. demo finishes in basement. structural framing to remain. permit is for demo only... p/u bathroom remodel permit at later date.Details
demo fixtures/finishes in downstairs extra bathroom. demo finishes in basement. structural framing to remain. permit is for demo only... p/u bathroom remodel permit at later date. | $6,500 |
| Nov 18, 2005 | Completed final sign-off Jun 2006 | 76 Forest Side Av | remodel (e) 2nd floor bathroom, location of fixtures in same general area, add 3 light fixtures on same switch, add 220 circuit to tub, no structural workDetails
remodel (e) 2nd floor bathroom, location of fixtures in same general area, add 3 light fixtures on same switch, add 220 circuit to tub, no structural work | $50,000 |