Back to bathroom remodel contractors
Gordon B Reese Const. Co.
- Based in
- Walnut Creek
- On San Francisco permits
- May 2011 to Feb 2013
- Last 24 months
- 0 permits filed
4 permits since 2000: 3 completed, 1 expired or cancelled.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
2 bathroom remodel permits: 1 completed, 1 expired or cancelled. Typically 0 days from filing to permit and 424 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| May 24, 2012 | Completed final sign-off Jul 2013 | 72 Macondray Ln | per cc-6023 report correct non permitted issues for all units 1-4. unit #2: convert & legalize 1/2 bath to ful bath.Details
per cc-6023 report correct non permitted issues for all units 1-4. unit #2: convert & legalize 1/2 bath to ful bath. | $20,000 |
| Sep 19, 2011 | Expired or cancelled withdrawn May 2012 | 72 Macondray Ln | 1)code upgrades per physical inspsection cc-6023 on 8/12/11.2)legalize basement level 1 and 2 to workspace with utility sink. 3 convert 1/2 bath at guest bedroom unit #4 level 1 to full bath.Details
1)code upgrades per physical inspsection cc-6023 on 8/12/11.2)legalize basement level 1 and 2 to workspace with utility sink. 3 convert 1/2 bath at guest bedroom unit #4 level 1 to full bath. | $450 |