Back to bathroom remodel contractors
Goodlife Kitchens
- Based in
- San Francisco
- On San Francisco permits
- Apr 2000 to Nov 2016
- Last 24 months
- 0 permits filed
60 permits since 2000: 56 completed, 4 expired or cancelled.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
15 bathroom remodel permits: 14 completed, 1 expired or cancelled. Typically 0 days from filing to permit and 70 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Nov 29, 2016 | Completed final sign-off Jan 2017 | 20 Sherwood Ct | replace tile, shower pan, tub & light fixture in 2 small bathrooms (no work in master bath)Details
replace tile, shower pan, tub & light fixture in 2 small bathrooms (no work in master bath) | $10,000 |
| Aug 14, 2014 | Completed final sign-off May 2015 | 227 Central Av | additional work: convert storage room to living room and add bathroom, replace wall @ ceiling lumber rotted due to roof leak, replace (e) skylight, ref. pa 201404304615 no building foot print expansion. no work on street facade.Details
additional work: convert storage room to living room and add bathroom, replace wall @ ceiling lumber rotted due to roof leak, replace (e) skylight, ref. pa 201404304615 no building foot print expansion. no work on street facade. | $32,000 |
| Apr 30, 2014 | Completed final sign-off May 2015 | 227 Central Av | remodel kitchen & bathrooms, new master bath, update plumbing and electric, new small deck, same new rear windowsDetails
remodel kitchen & bathrooms, new master bath, update plumbing and electric, new small deck, same new rear windows | $150,000 |
| Aug 5, 2013 | Completed final sign-off Jul 2014 | 405 Lyon St | update small kitchen & 2 bathroomsDetails
update small kitchen & 2 bathrooms | $8,500 |
| Sep 20, 2012 | Completed final sign-off Nov 2012 | 39 Arroyo Wy | 1 kitchen and 2 bath remodel. new cabinets, counters, plumbing fixtures, lighting. update plumbing and electrical. like for like. no structural. lighting to comply with cec 150(k).Details
1 kitchen and 2 bath remodel. new cabinets, counters, plumbing fixtures, lighting. update plumbing and electrical. like for like. no structural. lighting to comply with cec 150(k). | $45,000 |
| Apr 30, 2009 | Completed final sign-off Sep 2009 | 750 12th Av | work on 750 12th ave. only: convert existing alcove to new master bathroom and closets at 3rd floor. remodel entry at 1st floor. remvoe 2 existing doors and replace with one door and 2 side lites.Details
work on 750 12th ave. only: convert existing alcove to new master bathroom and closets at 3rd floor. remodel entry at 1st floor. remvoe 2 existing doors and replace with one door and 2 side lites. | $25,000 |
| Aug 11, 2008 | Completed final sign-off Jan 2009 | 783 09th Av | bathroom remodel. new fixtures, cabinet. tile, upgrade plumbing & electric. related to pa# 2008/08/05/8418. provide fluorescant light or t-24 o.s. in bathroom. also, provide exhaust fan w/bdd.Details
bathroom remodel. new fixtures, cabinet. tile, upgrade plumbing & electric. related to pa# 2008/08/05/8418. provide fluorescant light or t-24 o.s. in bathroom. also, provide exhaust fan w/bdd. | $6,500 |
| Jan 17, 2006 | Completed final sign-off Mar 2006 | 1101 Green St | replace cabinets & counters in kitchen & bath. update plumbing & electrics to code in unit 3303 only. no structural changes.Details
replace cabinets & counters in kitchen & bath. update plumbing & electrics to code in unit 3303 only. no structural changes. | $16,000 |
| Jan 10, 2005 | Completed final sign-off Mar 2005 | 28 Sequoia Wy | remodel kitchen & bathroom, demolish (e) no structural,upgrade plumbing & elec.replace cabinets,Details
remodel kitchen & bathroom, demolish (e) no structural,upgrade plumbing & elec.replace cabinets, | $22,000 |
| Aug 5, 2004 | Completed final sign-off Aug 2004 | 546 Panorama Dr | remodel bathroom-install fixtures, tile, vanity,window(side). no structural work.Details
remodel bathroom-install fixtures, tile, vanity,window(side). no structural work. | $8,000 |
| Jul 25, 2003 | Completed final sign-off Sep 2003 | 931 Kirkham St | kitchen & bathrooms remodel. upgrade electrics,plumbing,some tiling,new cabinets & countertops,newDetails
kitchen & bathrooms remodel. upgrade electrics,plumbing,some tiling,new cabinets & countertops,new | $22,000 |
| Aug 9, 2001 | Completed final sign-off Nov 2001 | 334 Winfield St | kitchen & bath remodel.replace cabinets,appliances,plumbing fixtures & drywall.upgrade plumbing & elDetails
kitchen & bath remodel.replace cabinets,appliances,plumbing fixtures & drywall.upgrade plumbing & el | $18,000 |
| Jan 18, 2001 | Completed final sign-off Mar 2001 | 731 Congo St | kitchen & baths remodel. replace old cabinets & fixtures & countertop upgrade elelctric & plumbing.Details
kitchen & baths remodel. replace old cabinets & fixtures & countertop upgrade elelctric & plumbing. | $11,000 |
| Jan 18, 2001 | Completed final sign-off Mar 2001 | 124 Clinton Pk | replace old cabinets & fixtures. kitchen & bath upgrade electrics & plumbing. new counter top.Details
replace old cabinets & fixtures. kitchen & bath upgrade electrics & plumbing. new counter top. | $9,500 |
| Sep 13, 2000 | Expired or cancelled expired Mar 2001 | 3423 Divisadero St | kitchen & bath remodel, new cabinets, new fixturesDetails
kitchen & bath remodel, new cabinets, new fixtures | $8,000 |