Back to bathroom remodel contractors
Good Vibes Design & Build Inc.
- Based in
- San Francisco
- On San Francisco permits
- Jun 2026 to Jun 2026
- Last 24 months
- 2 permits filed
2 permits since 2000: 1 completed, 1 in progress.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
1 bathroom remodel permit: 1 completed. Typically 0 days from filing to permit and 91 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 17, 2026 | Completed final sign-off Sep 2026 | 690 Chestnut St | unit 409c: remodel 2 bathrooms & 1 kitchen in kind, new cabinets, plumbing fixtures, new electrical, replace closet cabinets, door etc. new led recessed lights thru out, no exterior work, no wall stud demolition or construction, no change in plumbing fixture count, no change in room layout or use.Details
unit 409c: remodel 2 bathrooms & 1 kitchen in kind, new cabinets, plumbing fixtures, new electrical, replace closet cabinets, door etc. new led recessed lights thru out, no exterior work, no wall stud demolition or construction, no change in plumbing fixture count, no change in room layout or use. | $80,000 |