Good Guy Builders Inc
- Based in
- Napa
- On San Francisco permits
- Dec 2018 to Feb 2022
- Last 24 months
- 0 permits filed
7 permits since 2000: 4 completed, 3 never finaled.
Of the 3 never-finaled permits, 2 are 3 to 5 years old, 1 is 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Feb 3, 2022 | Never finaled issued Feb 2022, no final | 574 Castro St | update (e) master bathroom fixturs, new mini-split hvac system, lights upgrade. new smoke & co detectors. no layout changes, no structural work, work in-kind.Details
update (e) master bathroom fixturs, new mini-split hvac system, lights upgrade. new smoke & co detectors. no layout changes, no structural work, work in-kind. | $23,000 |
| Dec 1, 2021 | Never finaled issued Dec 2021, no final | 187 Beaver St | remodel lower level kitchen and covert lower level office to master bedroom.remodel upper level kitchen. exterior repair (rotting stairway less than 50%) of woodstairs from groudn to roof line all in-kind.Details
remodel lower level kitchen and covert lower level office to master bedroom.remodel upper level kitchen. exterior repair (rotting stairway less than 50%) of woodstairs from groudn to roof line all in-kind. | $130,000 |
| Sep 1, 2021 | Completed final sign-off Jun 2022 | 187 Beaver St | exploratory demo for structural entities for prep work, termite damage. removel of furnings, approx 100 sq. ft. patch and replace, use 5/8" sheetrock for repairs, interior only.Details
exploratory demo for structural entities for prep work, termite damage. removel of furnings, approx 100 sq. ft. patch and replace, use 5/8" sheetrock for repairs, interior only. | $500 |
| Sep 1, 2021 | Never finaled issued Sep 2021, no final | 187 Beaver St | replace 23 total windows, 8 street facing with aluminium wood-clad. max u-factor 0.30 or better. windows replaced like for like in (e) openings, operation & arrangement to remain the same.Details
replace 23 total windows, 8 street facing with aluminium wood-clad. max u-factor 0.30 or better. windows replaced like for like in (e) openings, operation & arrangement to remain the same. | $12,000 |
| Nov 5, 2020 | Completed final sign-off Jan 2023 | 162 15th Av | interiore remodel to an (e) kitchen, bathroom, powder room and adding a new bathroom. kitchen & powder room on 1/f. new master bathroom on 2/f. removal of wall between ktichen & living room. rear window alteration at 1/f & 2/f (non street visible). no alt to g/f.Details
interiore remodel to an (e) kitchen, bathroom, powder room and adding a new bathroom. kitchen & powder room on 1/f. new master bathroom on 2/f. removal of wall between ktichen & living room. rear window alteration at 1/f & 2/f (non street visible). no alt to g/f. | $150,000 |
| May 24, 2019 | Completed final sign-off Jul 2019 | 50 Fell St | revision to pa 2018-1220-8897 reconfigure restroom remodel & classroom separation originally approved. submit mep scope identified as deferred submittal. fa & sprinkler under sep permit.Details
revision to pa 2018-1220-8897 reconfigure restroom remodel & classroom separation originally approved. submit mep scope identified as deferred submittal. fa & sprinkler under sep permit. | |
| Dec 20, 2018 | Completed final sign-off Jul 2019 | 50 Fell St | 2nd fl - interior ti of east wing. no alteration to primary vertical and or lateral structural elements. no change in use. remove non load bearing walls to enlarge 1 classroom; remove 1 restroom & enlarge 1Details
2nd fl - interior ti of east wing. no alteration to primary vertical and or lateral structural elements. no change in use. remove non load bearing walls to enlarge 1 classroom; remove 1 restroom & enlarge 1 | $25,000 |