Back to bathroom remodel contractors
Good Builders Inc
- Based in
- San Francisco
- On San Francisco permits
- Sep 2014 to Oct 2025
- Last 24 months
- 2 permits filed
20 permits since 2000: 15 completed, 1 in progress, 3 never finaled, 1 expired or cancelled.
Of the 3 never-finaled permits, 3 are 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
2 bathroom remodel permits: 2 completed. Typically 114 days from filing to permit and 224 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 17, 2017 | Completed final sign-off Sep 2017 | 1422 33rd Av | remove all appliances and wall plaster in existing bathroom. rewire for new lighting and outlets, cover with new gypsum and tiles, build tiled shower with glass, install new toilet and vanity, install fan and ligting. upgrade house's electrical panel to 200 amps.Details
remove all appliances and wall plaster in existing bathroom. rewire for new lighting and outlets, cover with new gypsum and tiles, build tiled shower with glass, install new toilet and vanity, install fan and ligting. upgrade house's electrical panel to 200 amps. | $20,000 |
| Dec 22, 2016 | Completed final sign-off Aug 2018 | 156 Wool St | remodel of (e) bedroom into larger bedroom/bathroom via addition of usable area. (n) roof w/ raised eave height (keeping ridge height the same), replace (e) furnace.Details
remodel of (e) bedroom into larger bedroom/bathroom via addition of usable area. (n) roof w/ raised eave height (keeping ridge height the same), replace (e) furnace. | $120,000 |