Goliath Construction
- Based in
- South San Francisco
- On San Francisco permits
- Jan 2021 to Sep 2025
- Last 24 months
- 1 permit filed
9 permits since 2000: 9 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Deck permits
3 deck permits: 3 completed. Typically 44 days from filing to permit and 288 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 8, 2025 | Completed final sign-off Sep 2026 | 366 Naples St | 1st fl: relocate laundry & utilities. add media room with wetbar. 2 bedrooms and 1 full bath. 2nd fl: remodel (e) kitchen and bath. add 1 full bath and laundry. infill lightwell and new skylights. new deck at rear. replace front windows with in kind vinyl.Details
1st fl: relocate laundry & utilities. add media room with wetbar. 2 bedrooms and 1 full bath. 2nd fl: remodel (e) kitchen and bath. add 1 full bath and laundry. infill lightwell and new skylights. new deck at rear. replace front windows with in kind vinyl. | $170,000 |
| Aug 8, 2023 | Completed final sign-off Nov 2023 | 2627 18th Av | revision to pa# 202211307441. deck in backyard is changing the loading to a step up. 18" footings all around.Details
revision to pa# 202211307441. deck in backyard is changing the loading to a step up. 18" footings all around. | |
| Nov 30, 2022 | Completed final sign-off Nov 2023 | 2627 18th Av | closing a door in kitchen, opening a new one on right side of the same kitchen. create 2 bathrooms out of (e) hallway bathroom to create a master bedroom with its own bathroom. ground floor replace kitchenette cabinets & electrical fixtures on ground fl & entrance fl. new backyard deck.Details
closing a door in kitchen, opening a new one on right side of the same kitchen. create 2 bathrooms out of (e) hallway bathroom to create a master bedroom with its own bathroom. ground floor replace kitchenette cabinets & electrical fixtures on ground fl & entrance fl. new backyard deck. | $10,000 |